ENERGY SAVING BY PARTIAL COAL FIRING OF EXISTING OIL FIRED BOILERS

Objectif

The conversion of two steam boilers from oil to combined coal/oil firing to achieve estimated annual energy savings of between 3,200 and 3,600 TOE for 1 boiler, and 5,800 and 6,600 TOE for 2 boilers.
Frequent stoppages occurred during the test period, the most serious relating to transport of the coal between the main bunker and coal pulverizer, caused primarily by variable coal quality, although blockages especially in the grit arrestor, coal filter defects, post ignition in the boiler, coal metering defects also contributed. Boiler 5 operated for +- 1,000 hrs in coal/oil mixed operation, achieving a maximum coal/oil ratio of 80:20. During this time the second of the 2 boilers (No 4) was commissioned, allowing the weaknesses in No 5 to be corrected. The unsatisfactory grid arrestor was replaced by a wet combustion gases grid arrestor. It was also decided at this point to pre-heat the coal dust carrier air.
During the period 01.01.84 total fuel burned at the Castle Farm complex was 5,695 TOE. Predicted coal consumption for the same period was 3,000 TOE. Overall results demonstrate the need for further component and system testing under practical operating conditions to assessfuture prospects in terms both of application and economy.
Conversion of boilers (+- 13.5 steam/h) to combined coal/oil operation involved the errection of a complete coal storage/pulverizer and charging facility and the installation of a suitable burner system combined with necessary control, safety facilities and waste gas treatment systems to limit release of particulate emissions. Rough coal is filled into a 50 T/day silo equipped with metal detectors, passed through a coal pulverizer for drying using hot waste gas (coal dust with a degree of particles size 80% smaller than 75 um) and P/F storage hopper, finally reaching a 1t capacity boiler day-hopper. The supply of coal dust, air and oil for boiler operation is automatically regulated. The oil flame serves as pilot flame for the coal dust-air-mixture.
Following errection the boiler was subjected to a comprehensive test programme to demonstrate performance of the single aggregates, their interaction and overall plant functioning. The second boiler will be converted after the operational experience gained from running of the first plant has been analysed. This will allow for component and design changes if necessary.

Champ scientifique (EuroSciVoc)

CORDIS classe les projets avec EuroSciVoc, une taxonomie multilingue des domaines scientifiques, grâce à un processus semi-automatique basé sur des techniques TLN. Voir: Le vocabulaire scientifique européen.

Ce projet n'a pas encore été classé par EuroSciVoc.
Proposez les domaines scientifiques qui vous semblent les plus pertinents et aidez-nous à améliorer notre service de classification.

Vous devez vous identifier ou vous inscrire pour utiliser cette fonction

Programme(s)

Programmes de financement pluriannuels qui définissent les priorités de l’UE en matière de recherche et d’innovation.

Thème(s)

Les appels à propositions sont divisés en thèmes. Un thème définit un sujet ou un domaine spécifique dans le cadre duquel les candidats peuvent soumettre des propositions. La description d’un thème comprend sa portée spécifique et l’impact attendu du projet financé.

Appel à propositions

Procédure par laquelle les candidats sont invités à soumettre des propositions de projet en vue de bénéficier d’un financement de l’UE.

Données non disponibles

Régime de financement

Régime de financement (ou «type d’action») à l’intérieur d’un programme présentant des caractéristiques communes. Le régime de financement précise le champ d’application de ce qui est financé, le taux de remboursement, les critères d’évaluation spécifiques pour bénéficier du financement et les formes simplifiées de couverture des coûts, telles que les montants forfaitaires.

DEM - Demonstration contracts

Coordinateur

MITCHELSTOWN CO-OPERATIVE AGRICULTURAL SOC. LTD
Contribution de l’UE
Aucune donnée
Adresse
MITCHELSTOWN
CO. Cork
Irlande

Voir sur la carte

Coût total

Les coûts totaux encourus par l’organisation concernée pour participer au projet, y compris les coûts directs et indirects. Ce montant est un sous-ensemble du budget global du projet.

Aucune donnée
Mon livret 0 0