COMBINED HEAT AND POWER PLANT BASED ON A GAS TURBINE WITH STEAM INJECTION AND ON PROCESS STEAM DELIVERY TO INDUSTRY

Objective

Cogeneration with gas turbine and heat recovery boiler.

To replace existing boilers supplying process steam to industry by natural gas fired gas turbine with waste heat recovery boiler. The produced electricity is supplied to the public grid. Injected steam in the gas turbine allows control of NOx emissions and temporary increase of electricity production (from 37,8 to 46,3 MW) during peak periods.
Innovation: steam injection in gas turbine.