Skip to main content
Ir a la página de inicio de la Comisión Europea (se abrirá en una nueva ventana)
español es
CORDIS - Resultados de investigaciones de la UE
CORDIS
Contenido archivado el 2024-05-14

ERECTION OF A 250 KWel/237KWth - PEM FUEL CELL PLANT FOR COMBINED HEAT AND POWER PRODUCTION IN BERLIN-TREPTOW

Objetivo

The aim is to show that the integration of the PEM fuel cell into district heating systems can be an ideal supplement or alternative to the established technology used in cogeneration plants. This can only be done by setting up a plant with an output comparable to what is standard in cogeneration plants. A plant of this kind has not been installed to date.
The general benefits of fuel cell technology - high level of efficiency, virtually no moving parts, low noise emission levels, very low waste gas emission levels, minimum maintenance - are enhanced by the use of the PEM cell. The relatively low operating temperature of around 80°C permits the use of low-price materials and ensures a fast start-up. Moreover, the temperatures of central heating systems. The waste heat of the cell can, therefore, be used without the need for any expensive hydraulic circuits or storage facilities. This makes the cell suitable for use in small-scale district heating systems.
A considerable market potential is forecast for the PEM cell in the medium term since it is well suited for series manufacture. The aim of the demonstration project is to fulfil the requirements for series manufacture. This will make it possible in the medium term to reduce the currently high specific costs of around 13000 ECU / KW to less than 1500 ECU / KW

A Proton Exchange Membrane Fuel Cell (PEMFC), also know as a Solid Polymer Fuel Cell (SPFC), with an output of 250 kWel / 237 kWth is to be installed in the Berlin district of Treptow. The fuel cell is to be integrated into an existing district heating system run by Bewag which currently has an installed thermal output of 43.4 MW. The temperatures in the heating system's return permit easy assimilation of the available heat.
The fuel cell is to be operated using natural gas which is converted into hydrogen and carbon dioxide by the addition of oxygen in a reforming process. In addition the operation with gas-storaged hydrogen is planned.
The aim is to permit the both heat and power orientated generation. Full-load operation for the generation of heat can be maintained throughout the year. The auxiliary cooler which is installed makes it possible to generate power irrespective of the level of heat required. The low operating temperature predestinates the PEM fuel cell - as conventional small CHP stations - to cover the basic heat load. For the covering of peak loads during very cold days the existing peak boilers will supply heat.
The location of the plant in Berlin's city centre and its immediate proximity to the BEWAG headquarters are ideal for the presentation of the project to the public. The needs of specialists visiting the plant can be well catered for and there are no obstacles to the free flow of information. Finally the erection of this plant in the eastern part of Berlin as part of the former GDR (5 New Lander) means that this advanced technology will support the industrial development of East Germany.

Programa(s)

Programas de financiación plurianuales que definen las prioridades de la UE en materia de investigación e innovación.

Tema(s)

Las convocatorias de propuestas se dividen en temas. Un tema define una materia o área específica para la que los solicitantes pueden presentar propuestas. La descripción de un tema comprende su alcance específico y la repercusión prevista del proyecto financiado.

Convocatoria de propuestas

Procedimiento para invitar a los solicitantes a presentar propuestas de proyectos con el objetivo de obtener financiación de la UE.

Datos no disponibles

Régimen de financiación

Régimen de financiación (o «Tipo de acción») dentro de un programa con características comunes. Especifica: el alcance de lo que se financia; el porcentaje de reembolso; los criterios específicos de evaluación para optar a la financiación; y el uso de formas simplificadas de costes como los importes a tanto alzado.

DEM - Demonstration contracts

Coordinador

BERLINER KRAFT- UND LICHT (BEWAG)-AKTIENGESELLSCHAFT
Aportación de la UE
Sin datos
Dirección
PUSCHKINALLEE 52
12435 Berlin
Alemania

Ver en el mapa

Coste total

Los costes totales en que ha incurrido esta organización para participar en el proyecto, incluidos los costes directos e indirectos. Este importe es un subconjunto del presupuesto total del proyecto.

Sin datos
Mi folleto 0 0