Objective A method has been developed to determine the velocity reduction in the far wake of obstacles in the atmospheric boundary layer. Compared to the near wake, this far wake is the most important with regard to wind turbine siting, as close vicinity to obstacles will mostly be avoided because of the expected hazardous turbulence effects of the approach wind on the wind loading of the wind turbine and the reduction of its power output.WITHIN THE WIND ENERGY PART OF THE CEC R&D PROGRAMME ON NON-NUCLEAR ENERGY SOURCES, A NUMBER OF PROJECTS DEALING WITH WIND TURBINE WAKES AND OBSTACLE WAKES HAS BEEN BROUGHT TOGETHER IN A "CONCERTED ACTION". THE DIVISION OF TECHNOLOGY FOR SOCIETY OF TNO (MT-TNO, THE NETHERLANDS) HAS BEEN ASKED TO COORDINATE THIS CONCERTED ACTION ON "WAKE EFFECTS". MAIN CONTRACTORS ARE : DANISH MARITIME INSTITUTE (DMI, DENMARK), UNIVERSIDAD POLITECNICA DE MADRID (UPM, SPAIN), STATE UNIVERSITY OF ANTWERP (RUCA, BELGIUM), CENTRAL ELECTRICITY GENERATING BOARD (CEGB, UK), RISOE NATIONAL LABORATORY (RISO, DENMARK) AND MT-TNO. THE PROJECTS INVOLVED ARE MAINLY CONCERNED WITH THE DEVELOPMENT AND VALIDATION OF COMPUTER MODELS FOR THE CALCULATION OF THE TOTAL POWER PRODUCTION OF WIND FARMS; ONE PROJECT IS AIMED AT THE DEVELOPMENT OF A MANUAL CONTAINING GUIDELINES AND CALCULATION METHODS TO BE USED FOR SITING OF WIND TURBINES NEAR BUILDINGS AND OBSTACLES. THE ACTIVITIES WILL RESULT IN A FURTHER DEVELOPMENT AND EXTENSION OF THE EXISTING WIND FARM MODELS, BASED ON MORE ADVANCED TURBULENCE DESCRIPTION. MOREOVER, IN THESE MODELS ADDITIONAL MODULES WILL BE INCORPORATED CONCERNING THE SPECIFIC FEATURES OF SITING A WIND FARM IN TOPOGRAPHICALLY COMPLEX TERRAIN AND CONNECTION TO A WEAK POWER GRID. AN IMPORTANT TOPIC IN THE CONCERTED ACTION IS THE VALIDATION OF THE MODELS WITH DATA FINALLY BECOMING AVAILABLE FROM SEVERAL WIND FARMS IN EUROPE; MEASUREMENTS CAMPAIGNS IN THE TAENDPIPE WIND FARM (DENMARK), THE ZEEBRUGGE WIND FARM (BELGIUM) AND THE NIBE WIND TURBINES ARE PART OF THE CONCERTED ACTION. COORDINATION ACTIVITIES CONSIST OF THE ORGANIZATION AND REPORTING OF TECHNICAL PROGRESS MEETINGS AND THE PRESENTATION OF A SUMMARY REPORT OF OVERALL RESULTS. Fields of science engineering and technologyenvironmental engineeringenergy and fuelsrenewable energywind powerengineering and technologyelectrical engineering, electronic engineering, information engineeringelectrical engineeringpower engineeringelectric power transmission Programme(s) FP1-ENNONUC 3C - Research and development programme (EEC) in the field of Non-Nuclear Energy, 1985-1988 Topic(s) Data not available Call for proposal Data not available Funding Scheme CSC - Cost-sharing contracts Coordinator Business Unit of TNO Built Environment and Geosciences Address Van mourik broekmanweg 6 2628 XE Delft Netherlands See on map Links Website Opens in new window EU contribution € 0,00 Participants (6) Sort alphabetically Sort by EU Contribution Expand all Collapse all Central Electricity Generating Board (CEGB) United Kingdom EU contribution € 0,00 Address London See on map DANISH MARITIME INSTITUTE Denmark EU contribution € 0,00 Address Lyngby See on map RIJSKUNIV. ANTWERPEN Belgium EU contribution € 0,00 Address Antwerpen See on map TNO Netherlands EU contribution € 0,00 Address Apeldoorn See on map UN. POLITECNICA MADRID Spain EU contribution € 0,00 Address Madrid See on map VESTAS WIND SYSTEMS Denmark EU contribution € 0,00 Address Lem See on map