Objective

Objectives and problems to be solved :The objective of the project is to develop, integrate and prove a dry gas cleaning system on an existing biomass gasification combined heat and power plant (250 kith). The innovative idea of this project is a newly developed dry gas cleaning and heat recovery system. . The dry gas cleaning concept produces no waste water and, intends to solve and eliminate the tar problems associated with operation of biomass gasifiers by recalculating the tars back into the gasifier. The ultimate objective is therefore to create a new generation of energy efficient and environmentally friendly gasification systems. Description of the work: The project focuses on the following main points:
- Design and construct a hot producer gas (700-800°C) particulate cleaning system, which can operate continuously and achieve separation efficiency acceptable for engine applications, preferably without further particulate removal
- Design and construct a new generation small scale tar condensing, regenerative gas-gas heat exchanger able to provide a clean gas free from tars creating problems in an engine.
- Rebuild the carburettor and exhaust on an existing gas engine in order to achieve emissions of CO below 500 ppm, hydrocarbons below 100 ppm and NOx below 500 ppm.
- Test the complete small scale system including existing down-draft bio fuel fired gasifier of 250 kith capacity, dust separator, regenerative heat exchanger and engine-generator for at least a regenerative cycle (500 hours).
- Study tar characteristics and tar behaviour under varying reactor and cooling conditions with special attention to engine quality.
- Calculation of economical and environmental impact of the process in order to clarify whether the new gas treatment device used in small CHP gasification unit will be economically and environmentally beneficial to replace conventional plant. Expected Results and Exploitation Plans:
The main outputs of the project will be:
- New gas cleaning system for elimination of tar in biomass gasification processes.
- design, construction and testing of a complete biomass gasification combined heat and power small scale prototype plant (250 kith).
- Information on the tar behaviour in gasification and in engine.
- Investment and running costs reduction.
- A cleaner and more efficient system for production of CHP based on gasification. The exploitation of the results will be achieved though the involvement of two industrial partners specialised respectively in heat exchanger field and gasification field.

Programme(s)

Multi-annual funding programmes that define the EU’s priorities for research and innovation.

Topic(s)

Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.

Call for proposal

Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.

Data not available

Funding Scheme

Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.

CSC - Cost-sharing contracts

Coordinator

CENTRE DE COOPERATION INTERNATIONALE EN RECHERCHE AGRONOMIQUE POUR LE DEVELOPPEMENT - CIRAD
EU contribution
No data
Address
Campus International de Baillarguet
34032 MONTPELLIER
France

See on map

Total cost

The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.

No data

Participants (2)

My booklet 0 0