Summary:
Based on earlier experiences and on the results of the ARCAS-project, the project group has the know- how to design and to build a Small Bio-power plant with a capacity up to 50 kWel. All CAD-plots of the plant are available and the Meurer- group can produce the plant in its own work-shops at Freren ( Germany ). The Meurer-group is actively seeking for customers who are interested to buy and to operate the gasification system based on their biomasses .To reach a system with a high availabilty a partner will be searched who will operate a Bio-power plant, repairs and bottle necks will be eleminated together with Meurer Maschinen.
The Meurer-group also will sell licences to other users.
Part1: The special design of the gasifier is characterised by co-current, buttom feeded, two stages
Part2: The design of the gascleaning system is defined by precleaning the gas by adsorption with the own fuel, cooling and dedusting and tar-removal by an electrical condensor. This type of tar removal system, especially the electrical condensor, is very new and as other groups working in the field of biomass- gasification know IC - engines need a tar -free fuel-gas. That is the reason why the project-group of ARCAS believes that the electrical condensor is the key component for tar removal.