Skip to main content
Aller à la page d’accueil de la Commission européenne (s’ouvre dans une nouvelle fenêtre)
français français
CORDIS - Résultats de la recherche de l’UE
CORDIS
Contenu archivé le 2024-04-16

Treatment of radioactive solvent waste by catalytic oxidation

Objectif

As a result of past reprocessing campaigns performed in the EUREX pilot plant, about 26 m{3} of spent solvent were produced. Taking into account the difficulty to process this waste type (a mixture of tri-butyl-phosphate, tri-capryl-amine, kerosene and methyl-benzenes) according to existing technologies, this research activity aims at setting-up a suitable treatment process capable of reaching three major objectives:

- reduction of the waste volume by a factor at least equal to 10;
- oxidative destruction of the reduced volume waste;
- compatibility of the processed waste with conventional immobilisation matrices like cement.

For the specific purpose, it is intended to investigate the potentialities of the combination of distillation with wet oxidation.
The feasibility of distillation as a method drastically to reduce the volume of radioactive solvent waste (a mixture of tri-butyl-phosphate, tri-capryl-amine, kerosene and methyl benzenes) has been demonstrated. More than 88% of the solvent waste can be distilled with a negligible rising of the activity, so that the top product of the of the distillation can be conventionally incinerated according with the environmental radioactivity receptivity.

The bottom residue needed for wet oxidation hot laboratory experiments has been produced. A section of the cold technological hall of the EUREX plant has been modified for the cold bench scale wet oxidation experiments.
Work programme:

The work programme includes the following tasks:

- Conduction of laboratory scale distillation tests with genuine waste from the EUREX plant in order to optimize the operating parameters to get a DF of the top fraction which satisfy incineration criteria in conventional plants
- Wet oxidation experiments at laboratory scale and at bench scale. These experiments will involve processing of 3-5 litres batches of inactive simulated waste in order to quantify the scaling-up effect and to optimise the process parameters which enable a minimisation of the final aqueous waste volume.
- Conduction of cementation tests using ordinary Portland cement (possibly with inorganic additives) on the inactive aqueous waste coming from the wet oxidation bench-scale experiments.
- Preliminary design of a full scale treatment plant for reprocessing the whole stock of the EUREX solvent waste, including the distillation section, the wet oxidation section and the interface with the cementation plant.

Programme(s)

Programmes de financement pluriannuels qui définissent les priorités de l’UE en matière de recherche et d’innovation.

Thème(s)

Les appels à propositions sont divisés en thèmes. Un thème définit un sujet ou un domaine spécifique dans le cadre duquel les candidats peuvent soumettre des propositions. La description d’un thème comprend sa portée spécifique et l’impact attendu du projet financé.

Appel à propositions

Procédure par laquelle les candidats sont invités à soumettre des propositions de projet en vue de bénéficier d’un financement de l’UE.

Données non disponibles

Régime de financement

Régime de financement (ou «type d’action») à l’intérieur d’un programme présentant des caractéristiques communes. Le régime de financement précise le champ d’application de ce qui est financé, le taux de remboursement, les critères d’évaluation spécifiques pour bénéficier du financement et les formes simplifiées de couverture des coûts, telles que les montants forfaitaires.

CSC - Cost-sharing contracts

Coordinateur

Ente per le Nuove Tecnologie, l'Energia e l'Ambiente (ENEA)
Contribution de l’UE
Aucune donnée
Adresse

13040 Saluggia (Vercelli)
Italie

Voir sur la carte

Coût total

Les coûts totaux encourus par l’organisation concernée pour participer au projet, y compris les coûts directs et indirects. Ce montant est un sous-ensemble du budget global du projet.

Aucune donnée
Mon livret 0 0