Skip to main content
Aller à la page d’accueil de la Commission européenne (s’ouvre dans une nouvelle fenêtre)
français français
CORDIS - Résultats de la recherche de l’UE
CORDIS
Contenu archivé le 2024-05-24

Thematic network on the role of monitoring in a phased approach to disposal

Objectif

The scope of work will cover potential monitoring requirements during all stages of disposal system development.

It will consider a broad range of potential monitoring requirements including, but not limited to, monitoring for the following reasons:
(i) Establishment of baseline conditions.
(ii) System of performance at the time of monitoring.
(iii) Provision of data to be used in evaluations/assessments of repository performance.
(iv) Monitoring in the broad sense e.g. developments in relevant areas of science.

It is proposed that the project is divided into four work packages.
.The first work package would be information gathering and improving the definition of work to be carried out in subsequent work packages.
.The second work package would be to describe what parameters might require monitoring and the reasons for that monitoring.
.The third work package would address techniques and strategies for monitoring.
.The fourth work package would be to compile a final report of the project.

Many countries are now considering a phased approach to disposal of radioactive waste, whereby disposal would be implemented by a series of reversible steps. At each stage in the process, information from monitoring will be required as inputs to the decision-making process. A recent EC Concerted Action on Retrievability concluded that in most EC countries monitoring programmes are in an early stage of development.

This thematic network will bring together expertise from many countries in order to achieve the following objectives:
- To improve the understanding of the role of and options for monitoring within a phased approach to disposal.
- To identify how monitoring can contribute to decision-making, operational and post-closure safety and confidence in safety.

A project inception report describing the scope of work in more detail will be developed 6 months after the start of the contract. A final report will be produced at the end of the project. The final report will provide an authoritative basis for the development of national repository monitoring programmes.

1.To improve the understanding of the role of and options for monitoring within a phased approach to disposal.
2.To identify how monitoring can contribute to decision-making, operational and post-closure safety and confidence in safety.

Champ scientifique (EuroSciVoc)

CORDIS classe les projets avec EuroSciVoc, une taxonomie multilingue des domaines scientifiques, grâce à un processus semi-automatique basé sur des techniques TLN. Voir: Le vocabulaire scientifique européen.

Vous devez vous identifier ou vous inscrire pour utiliser cette fonction

Programme(s)

Programmes de financement pluriannuels qui définissent les priorités de l’UE en matière de recherche et d’innovation.

Thème(s)

Les appels à propositions sont divisés en thèmes. Un thème définit un sujet ou un domaine spécifique dans le cadre duquel les candidats peuvent soumettre des propositions. La description d’un thème comprend sa portée spécifique et l’impact attendu du projet financé.

Appel à propositions

Procédure par laquelle les candidats sont invités à soumettre des propositions de projet en vue de bénéficier d’un financement de l’UE.

Données non disponibles

Régime de financement

Régime de financement (ou «type d’action») à l’intérieur d’un programme présentant des caractéristiques communes. Le régime de financement précise le champ d’application de ce qui est financé, le taux de remboursement, les critères d’évaluation spécifiques pour bénéficier du financement et les formes simplifiées de couverture des coûts, telles que les montants forfaitaires.

THN - Thematic network contracts

Coordinateur

UNITED KINGDOM NIREX LTD
Contribution de l’UE
Aucune donnée
Adresse
Curie Avenue
OX11 0RH DIDCOT,HARWELL,CHILTON
Royaume-Uni

Voir sur la carte

Coût total

Les coûts totaux encourus par l’organisation concernée pour participer au projet, y compris les coûts directs et indirects. Ce montant est un sous-ensemble du budget global du projet.

Aucune donnée

Participants (11)

Mon livret 0 0