Objectif
- Setting up an innovative design of semi-Kaplan turbine covered with a superalloy (FeCoNi) that allows a higher situation of the machine, reducing the costs of the civil works and the maintenance costs.
- Installation of a new management system to increase the production, based on spectral analysis to control the running conditions (cavitation, vibration...).
- Adjusting of the civil works to the environmental existing conditions to preserve the ecologic level of the area.
- Development of the project in a intracommunitary cooperation between the French Company NEYRPIC and the Spanish Companies NEYRPIC ESPAGNOLA and CERSA (NAVARRO GROUP).
The Power Station was completely finished in January 1993, but it did not work until March 1993, due to the lack of water. It began to work in March, although there was not flow enough for a conventional turbine to allow this installation to work under the minimum cavitation thershold.
The commercial exploitation of the Power Station began on April 1993.
The Cavitation system has allowed the working of the Power station at low charges, in water scarce periods, thanks to the fact of the complete control on the working conditions of the machine with the additional security of the anticavitation lining of the blades of the wheels and the waist.
Since the point of view of the owner of the Power Station, we consider that the project has been successful and it can be very useful for the exploitation of the Power Station because it allows :
- Preventive maintenance of the installation being able to programme the stops depending on the water circulating in the river, avoiding losses of production.
- Telediagnostic of the equipment : it allows to make the diagnostic of the installation at distance via telephone, radio or bearing waves.
- More resistance to the cavitation of the wheels.
- More security of the reliability in the working of the installation due to the permanent following made by the SEMYD equipment.
The operation cost of the SEMYD system is insignificant due to the low consumption of energy of the equipment.
The life time of an Hydropower Station of this type is more than 25 years.
Recuperation of an old power station fully integrated in the natural environment, preserving its original conditions with regard to present ecological environment and touristic values.
The turbine rollers protected with a super alloy linning (FeCoNi) on the blades and other parts of the turbine. This allows its installation at a higher level with relation to down stream water level.
Significant saving in the central civil works.
Possibility of examination and maintenance without using the suction pump.
More resistance to cavitation.
Improvements in production and performance through the use of a cavitation detector and vibrator coordinated with the level regulator (with regard to the water level down stream and machinery conditions over the opening limit of the distributor).
Conditions monitoring and telediagnostic possibilities
The context is the field of the hydroelectrical energy production.
The average estimated annual production during a normal hydraulic year is of 3,650,000kWh (electric kWh).
The cost of energy produced is the estimated overcost compared to conventional equipment (this overcost is for the first realization. In the future, it will probably be reduced) is near the 15%.
Champ scientifique (EuroSciVoc)
CORDIS classe les projets avec EuroSciVoc, une taxonomie multilingue des domaines scientifiques, grâce à un processus semi-automatique basé sur des techniques TLN. Voir: Le vocabulaire scientifique européen.
CORDIS classe les projets avec EuroSciVoc, une taxonomie multilingue des domaines scientifiques, grâce à un processus semi-automatique basé sur des techniques TLN. Voir: Le vocabulaire scientifique européen.
Ce projet n'a pas encore été classé par EuroSciVoc.
Proposez les domaines scientifiques qui vous semblent les plus pertinents et aidez-nous à améliorer notre service de classification.
Vous devez vous identifier ou vous inscrire pour utiliser cette fonction
Programme(s)
Programmes de financement pluriannuels qui définissent les priorités de l’UE en matière de recherche et d’innovation.
Programmes de financement pluriannuels qui définissent les priorités de l’UE en matière de recherche et d’innovation.
Thème(s)
Les appels à propositions sont divisés en thèmes. Un thème définit un sujet ou un domaine spécifique dans le cadre duquel les candidats peuvent soumettre des propositions. La description d’un thème comprend sa portée spécifique et l’impact attendu du projet financé.
Données non disponibles
Les appels à propositions sont divisés en thèmes. Un thème définit un sujet ou un domaine spécifique dans le cadre duquel les candidats peuvent soumettre des propositions. La description d’un thème comprend sa portée spécifique et l’impact attendu du projet financé.
Appel à propositions
Procédure par laquelle les candidats sont invités à soumettre des propositions de projet en vue de bénéficier d’un financement de l’UE.
Données non disponibles
Procédure par laquelle les candidats sont invités à soumettre des propositions de projet en vue de bénéficier d’un financement de l’UE.
Régime de financement
Régime de financement (ou «type d’action») à l’intérieur d’un programme présentant des caractéristiques communes. Le régime de financement précise le champ d’application de ce qui est financé, le taux de remboursement, les critères d’évaluation spécifiques pour bénéficier du financement et les formes simplifiées de couverture des coûts, telles que les montants forfaitaires.
Régime de financement (ou «type d’action») à l’intérieur d’un programme présentant des caractéristiques communes. Le régime de financement précise le champ d’application de ce qui est financé, le taux de remboursement, les critères d’évaluation spécifiques pour bénéficier du financement et les formes simplifiées de couverture des coûts, telles que les montants forfaitaires.
Coordinateur
28003 Madrid
Espagne
Les coûts totaux encourus par l’organisation concernée pour participer au projet, y compris les coûts directs et indirects. Ce montant est un sous-ensemble du budget global du projet.