Skip to main content
European Commission logo
English English
CORDIS - EU research results
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary
Content archived on 2022-12-27

HYDRO ELECTRIC SCHEME UTILISING EXISTING CONDUITS WITH BENEFICIAL ENVIRONMENTAL IMPACT

Objective

To utilise existing irrigation conduits for the production of electricity.

This project is to utilise an existing irrigation infrastructure for a hydroelectric station, which will partially offset power used for pumping water in other parts of the system.
An added benefit is that the discharge water will flow into the Lake Urbino, which has a very high natural salinity level. The in -flow of a controlled quantity of fresh water will both reduce salinity and increase oxygenation, this improving the lake eco -system and allowing the promotion of agriculture. Head 100 metres (net)
Flow 0. 75 m3. s -1
Turbine Francis
Turbine power 700 kW
Speed 1000 rpm
Generator asynchronous
End-use grid-connected

Topic(s)

Data not available

Call for proposal

Data not available

Coordinator

Office d'Équipement Hydraulique de la Corse
EU contribution
No data
Address
Avenue Paul Giacobbi
20601 Bastia
France

See on map

Total cost
No data