Skip to main content
European Commission logo print header
Zawartość zarchiwizowana w dniu 2022-12-27

HYDRO ELECTRIC SCHEME UTILISING EXISTING CONDUITS WITH BENEFICIAL ENVIRONMENTAL IMPACT

Cel

To utilise existing irrigation conduits for the production of electricity.

This project is to utilise an existing irrigation infrastructure for a hydroelectric station, which will partially offset power used for pumping water in other parts of the system.
An added benefit is that the discharge water will flow into the Lake Urbino, which has a very high natural salinity level. The in -flow of a controlled quantity of fresh water will both reduce salinity and increase oxygenation, this improving the lake eco -system and allowing the promotion of agriculture. Head 100 metres (net)
Flow 0. 75 m3. s -1
Turbine Francis
Turbine power 700 kW
Speed 1000 rpm
Generator asynchronous
End-use grid-connected

Temat(-y)

Data not available

Zaproszenie do składania wniosków

Data not available

Koordynator

Office d'Équipement Hydraulique de la Corse
Wkład UE
Brak danych
Adres
Avenue Paul Giacobbi
20601 Bastia
Francja

Zobacz na mapie

Koszt całkowity
Brak danych