Skip to main content
European Commission logo
English English
CORDIS - EU research results
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary
Content archived on 2022-12-27

RECOVERY OF ENERGY FROM RELEASED WATER AND RESERVE FLOW FROM A FLOOD PROTECTION RESERVOIR

Objective

To demonstrate the exploitation of spill water and reserve flows released from a flood protection reservoir.

Surplus water released from time to time from a flood control reservoir, together with water released to maintain minimum required river flows are to be exploited by channeling them below thedam o two Francis turbines. The two turbines have capacities of 1. 1 m3/s, (for the flows) and 4. 4 m3/s, (for major flows).
The head is 30 m and their power outputs, (at the generators) are 300 kW and 1100 kW respectively. The electricity will be sold to the grid, allowing the use of asynchronous generators, and use of the reservoir means that turbining will be during peak periods as much as possible. Another advantage of the project is that monitoring of the reservoir level and the release of water will give better control of river flows and flowed control.

Topic(s)

Data not available

Call for proposal

Data not available

Coordinator

GENERALE HYDRO-ELECTRICITE (GHE)
EU contribution
No data
Address
PLACE RENAULT 3 B.P. 220
92503 Rueil Malmaison Cedex
France

See on map

Total cost
No data