Skip to main content
Go to the home page of the European Commission (opens in new window)
English English
CORDIS - EU research results
CORDIS
Content archived on 2024-05-21

Natural gas fuelled solid oxide fuel cells (sofcs) for cogeneration of electricity and chemicals

Objective

The objective of this proposal is the study and development of improved methane fuelled solid oxide fuel cells (Sofas) for cogeneration of electric power and useful chemicals (e.g. synthesis gas). This will be done by a careful search for and characterization of new anode electrode materials with improved catalytic andelectrocatalytic properties for selective oxidation of methane to synthesis gas(CO/H2). In parallel with this, the known conventional technology will be improved by study and subsequent development of innovative alternative fuel cell configurations and modes of operation, namely
(i) simplified Sofas with no separation of the oxidant and fuel streams and
(ii) Sofas operating under forced periodic reversal of flow.

Programme(s)

Multi-annual funding programmes that define the EU’s priorities for research and innovation.

Topic(s)

Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.

Data not available

Call for proposal

Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.

Data not available

Funding Scheme

Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.

CSC - Cost-sharing contracts

Coordinator

INSTITUTE OF CHEMICAL ENGINEERING AND HIGH TEMPERATURE PROCESSES - FOUNDATION OF RESEARCH AND TECHNOLOGY HELLAS
EU contribution
No data
Address
Stadiou Street, Platani
26500 RION-ACHAIA
Greece

See on map

Total cost

The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.

No data

Participants (5)

My booklet 0 0