IMPROVED ENERGY EFFICIENCY OF LARGE SCALE RECIPROCATING COMPRESSOR PLANT BY AIR INTAKE COOLING AND OPTIMUM PRESSURE BALANCE

Objective

To demonstrate a 35% volumetric increase and 30% electrical energy saving in the operation of a large single stage and 2-stage reciprocating compressor plant in a glass works by cooling the intake air to the machines down to -25 deg. C and removing moisture.
Also, to prove that there are benefits in product quality through moisture free air.
The project will show the efficient water removal technique of the compressor pre-cooler unit and the optimum pressure balance/integration of a 2-pressure system.
This is the first time that this technology has been applied to a single and 2-stage reciprocating compressor plant with delivery pressures of 3 and 6 bar respectively and temperatures as high as + 85 deg. C.
The installation has not operated as intended, therefore, there is no operational experience or results. Work is continuing to resolve a vibration problem associated with the operational characteristics of the particular compressors. The single stage machines have three modes of operation; fully loaded, half-loaded and off-loaded. It is in the half-load position where excessive vibration is created.
Modifications are to be implemented to include the removal of this middle mode and the fitting of inlet mufflers to reduce the pressure pulses that go back down the intake lines. This work will be carried out during 1994; it is then expected that the pre-cooler installation can operate satisfactorily be reducing the intake air temperature to -25 deg. C and giving the volumetric increase and energy saving benefit as envisaged.
There are a total of 9 reciprocating compressors serving the glass works, 7 single stage and two 2-stage, all of which are of the oil lubricated design with externally mounted separators.
The present situation is that the low and high pressure systems operate indepedent of each other with 4-low pressure compressors fully loaded and one modulating 85%) and one high pressure machine modulating (53%). By cooling the compressor intake air down to - 25 deg. C, the total volumetric increase is 20% (18% through mass and 2% by moisture removal), such that only 4 compressors in total are required to operate. With the existing independent arrangement, this would mean that the high pressure compressor would continue to modulate (be it at a lower level) and 3 of the low pressure machines fully loaded and one continuing to modulate. This would not be the ideal method to operate the system and does not take full advantage of the potential electical savings from compressor pre-cooling due to theinefficiencies of part loaded machines.
The proposed arrangement utilises the 100 mm diameter interconnection between low and high pressure systems with the incorporation of a pressure control valve. By taking advantage of the 2-stage high pressure compressors and maintaining the single machine necessary at full load a much more efficient system is possible. The pressure control valve, through a pressure transmitter, will maintain the high pressure system at 6 bar allowing the surplus capacity into the 3 bar low pressure system. With a fall in pressure the control valve will drive towards the closed position and with a rise in pressure open. The requirement now for the low pressure system is a maximum of 3 compressors. With increasing pressure in the 3 bar system, the third L.P. compressor will modulate.
With this improved arrangement, a maximum of 4 compressors will operate; without the controlled interconnection between the two systems 5 machines would be continuously running with 2 modulating.
The Construction Phase of the project will take 7-months to complete including Commissioning. A 12 months Measurement period will follow where the installations operating conditions are to be closely monitored and the overall performance evaluated.

Fields of science (EuroSciVoc)

CORDIS classifies projects with EuroSciVoc, a multilingual taxonomy of fields of science, through a semi-automatic process based on NLP techniques. See: The European Science Vocabulary.

This project has not yet been classified with EuroSciVoc.
Be the first one to suggest relevant scientific fields and help us improve our classification service

You need to log in or register to use this function

Programme(s)

Multi-annual funding programmes that define the EU’s priorities for research and innovation.

Topic(s)

Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.

Call for proposal

Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.

Data not available

Funding Scheme

Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.

DEM - Demonstration contracts

Coordinator

IRISH GLASS BOTTLE COMPANY LTD
EU contribution
No data
Address
SOUTH BANK ROAD RINGSEND
4 Dublin
Ireland

See on map

Total cost

The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.

No data