Feasability study of an urban fuel cell network with coal gasifier

Objectif



The fuel cell technology has considerably progressed within the last few years. Experimental models and some prototypes have been designed and produced, and the result of the tests are very promising.

On the basis of these developments, the main objective of this project is to evaluate the technical feasability and the economic advantages of connecting a cogeneration power plant using Solid Oxide or Molten Carbonate Fuel Cell fed with gases issued from coal gasification to an existing urban network.
For this purpose, the METZ network (electric power: 265 MW, thermal power: 183 MW) has been identified as a reference for the study. In order that the results of this study can be then extrapolated for other European networks, a 50 MW power plant will be considered and the characteristics of the unit will take into account, when possible, characteristics and constraints of different European networks.

The power plant includes a coal gasifier, a specific dust removal process and a highly efficient gas treatment process devoted to avoid spoiling of the fuel cell by hydrogen sulfide, dust, chloride, .., the fuel cell stack, a complementary gas oxidation process and heat recuperators.

In comparison with conventional cogeneration technologies, as gas turbine, steam turbine or thermal engine, such a process presents, a priori, the main following advantages:

- higher electric efficiency: 45 to 50 % instead of 30 to 35 %,
- better heat valorization due to the high operating temperature of fuel cells (650 to 1000°C),

- lower accoustic level (no rotating machinery in fuel cells), which will contribute to an easier urban integration,

- lower operating costs.

Furthermore, the integration of a coal gasifier in fuel cell power plants is potentially the most efficient and least polluting method to generate electricity from coal.

The work programme will comprise five steps:

- the definition of all requirement related to the cogeneration unit such as the performance and operating conditions, the operating constraints (safety, environment, ...) and the process interfaces,

- the identification of the most adapted arrangement for the industrial unit, in particular defining the best structure and the main operating equipment in coherence with the network requirements,

- the preliminary design of the above-mentionned equipment,

- the determination of the capital costs and operating costs to deduct the final cost of the electricity and thermal energy produced,

- the evaluation of advantages of cogeneration using fuel cells fed with coal gasification and the identification of the technical points to be solved to make this process competitive with regards to conventional processes. This evaluation will take into account the characteristics of various coals and european urban networks.

The business plan of a 50 MW power plant demonstrator, including eventually complementary required research actions, will be proposed.

Programme(s)

Programmes de financement pluriannuels qui définissent les priorités de l’UE en matière de recherche et d’innovation.

Thème(s)

Les appels à propositions sont divisés en thèmes. Un thème définit un sujet ou un domaine spécifique dans le cadre duquel les candidats peuvent soumettre des propositions. La description d’un thème comprend sa portée spécifique et l’impact attendu du projet financé.

Appel à propositions

Procédure par laquelle les candidats sont invités à soumettre des propositions de projet en vue de bénéficier d’un financement de l’UE.

Données non disponibles

Régime de financement

Régime de financement (ou «type d’action») à l’intérieur d’un programme présentant des caractéristiques communes. Le régime de financement précise le champ d’application de ce qui est financé, le taux de remboursement, les critères d’évaluation spécifiques pour bénéficier du financement et les formes simplifiées de couverture des coûts, telles que les montants forfaitaires.

CSC - Cost-sharing contracts

Coordinateur

Bertin et Cie S.A.
Contribution de l’UE
Aucune donnée
Adresse
Zone Industrielle
40220 Tarons
France

Voir sur la carte

Coût total

Les coûts totaux encourus par l’organisation concernée pour participer au projet, y compris les coûts directs et indirects. Ce montant est un sous-ensemble du budget global du projet.

Aucune donnée

Participants (4)

Mon livret 0 0