PRE SUBSEA DEVELOPMENT PROJECT [STAGE 2B]

Objetivo

VASPS Stage II project (OG./00114/91/UK) demonstrated the viability of the VASPS as a liquid gas separator. The overall objective of the present Stage is to make a further step towards the marinization by testing a VASPS unit that would be similar to the subsea one from a functional point of view. A VASPS prototype will be integrated with a pump and extensive functional tests will be performed in Trecate to prove the operability of the whole system.
Furthermore, according to Stage II results and taking advantage of the modifications necessary to integrate a pump, the internals and the overall length of the unit will be revised and a Modified VASPS will be tested to verify the possibility to enhance its performances and to verify the applicability of the unit in a wider range of conditions.
Tests on VASPS as separator performed in Trecate have demonstrated that VASPS separation performances are improved reaching high separation efficiency with a liquid flowrate of 65-75 m3/h.
Tests on VASPS pumping system in Trecate has demonstrated a very high operability of the unit and of the relevant control system, confirming the viability of the VASPS as subsea pumping system. From these tests it was also possible to obtain useful information to the design of a subsea unit.
Tests on level sensors indicate that it is possible to control the level with "off the shelf" instrumentation.
VASPS is an innovative two phase separation system designed for subsea application and integrated an Electric Submerisble Pump. One of the peculiarities of the VASPS is the mechanical arrangement which is composed of a standard casings and wellhead components installed in a dummy well using established drilling-completion procedures and equipment. In this arrangement a conventional submersible pump is installed inside the casings to deliver the liquid phase into a dedicated pipeline. VASPS belongs to the category of "Subsea Boosting Systems". Among various potential applications, which are field dependent, VASPS results very interesting for deepwaters fields where the back pressure on the well dictated by the liquid column in the risers/flowlines is significant. Similarly VASPS can be conveniently used in the exploitation of heavy oil fields where the capabilities of gas lift are very limited either by the limited amount of gas available or by the surface facilities. Similar considerations apply for gas-condensate fields where problems associated with transportation are significant.
VASPS finds also interesting applications in extending the field life. Indeed it is quite frequent that approaching the end of the field life two intrafield pipelines, previously needed at full capacity, become underused. In this case the oil production can be diverted to just one of them and the redundant pipeline can be re-used as gas intrafield pipeline. Following the successful completion of VASPS Stage II in June 95, the new programme started in July 1995 with the primary objective to make a further step towards the final subsea application. In particular, the new project phase has two main goals :
* verify the operability of the VASPS now integrated with a pumping system and relevant control system
* verify the possibility to enhance the VASPS separation performances by using different internals and a longer unit. To achieve these targets the project has been organised inthe following steps:
A. Additional Tests : after having introduced some minor modifications to the helix design based on Stage II results, some additional tests will be performed in Trecate to verify the significance of indications obtained from Stage II.
B. VASPS Design Review based on Stage II and "Additional Tests" results, the VASPS process will be reviewed to incorporate the latest achievements. As consequence of this review, and considering that however the present VASPS prototype should be modified to allow the integration of a pumping system, a Modified VASPS unit will be fabricated. In particular the VASPS unit will be extended of about 4 m and two different helixes will be fabricated.
C. Tests on a Modified VASPS unit: the Modified VASPS unit with two different helixes will be tested to verify its operability and efficiency before its integration with the pump.
D. Tests with the pump: the VASPS will be integrated with a conventional centrifugal pump installed externallyto the VASPS.

Ámbito científico (EuroSciVoc)

CORDIS clasifica los proyectos con EuroSciVoc, una taxonomía plurilingüe de ámbitos científicos, mediante un proceso semiautomático basado en técnicas de procesamiento del lenguaje natural. Véas: El vocabulario científico europeo..

Para utilizar esta función, debe iniciar sesión o registrarse

Programa(s)

Programas de financiación plurianuales que definen las prioridades de la UE en materia de investigación e innovación.

Tema(s)

Las convocatorias de propuestas se dividen en temas. Un tema define una materia o área específica para la que los solicitantes pueden presentar propuestas. La descripción de un tema comprende su alcance específico y la repercusión prevista del proyecto financiado.

Convocatoria de propuestas

Procedimiento para invitar a los solicitantes a presentar propuestas de proyectos con el objetivo de obtener financiación de la UE.

Datos no disponibles

Régimen de financiación

Régimen de financiación (o «Tipo de acción») dentro de un programa con características comunes. Especifica: el alcance de lo que se financia; el porcentaje de reembolso; los criterios específicos de evaluación para optar a la financiación; y el uso de formas simplificadas de costes como los importes a tanto alzado.

DEM - Demonstration contracts

Coordinador

AGIP (UK) LTD
Aportación de la UE
Sin datos
Dirección
WELLINGTON CIRCLE REDMOSS
AB14JG Aberdeen
Reino Unido

Ver en el mapa

Coste total

Los costes totales en que ha incurrido esta organización para participar en el proyecto, incluidos los costes directos e indirectos. Este importe es un subconjunto del presupuesto total del proyecto.

Sin datos
Mi folleto 0 0