PV POWER FOR RAILWAY SIGNALS NEAR SIENA

Objective

To demonstrate the reliability, easy maintenance and cost effectiveness of a pv system for railway signals and safety systems.

On the Cecina-Saline di Volterra railway line a new safety system is installed.
Three 4 kWp PV systems now supply the electric power for an interlock relay system (ACEI), which needs an uninterruptable power supply (UPS).
The ACEI system assures by automatic interlocks that only one train can run in a given tract.
The load requirements are now:
150 V ac, 50 Hz, for the whole system, by inverter, 600 VA.
Daily consumption is of the order of 7 kWh per system.
Nr.subsystems : 3
Power subsys. : 4032 kWp
Total power : 12.1 kWp
Backup : grid
Nr. of modules : 3 x 84 = 252
Module descrip. : ITALSOLAR, 36 MS/CE, 48 Wp, monocrystalline, glass cover and Tedlar back.
Connection : 12 in series (144 V), seven parallel, series connected strings. One string permanently and directly coupled to the battery, the six other strings through two charge controllers.
Support: on racks (zinced iron), in three different places along the railroad, 55 deg. from horizontal.
Max.pwr.trcker : none
Chrg.controller : manufacturer: SEI, mod. SCR, designed for higher reliability
Battery : FIAMM (lead acid), model 2SLA300 MONOLITE, sealed, with recombination valves. Maintenance free.
Batt.(V) : 144
Capacity :
Batt. (Ah) : 300 (100h) for each sub-system
Batt. (kWh) : 43 (for each subsystem)
Inverter : Two dc/ac inverter, type S.E.I sine wave, pulse width modulation, 120 kHz. (One in operation, one in standby, entering in function within 10 ms after output voltage of the first inverter drops by more than 10%).
Inv. in (V) : 144 V
Inv. out(V) : 150 V
Inv. power(kW) : 0.6
Load descript. : Two DC/AC inverters, 144 V dc to 150 V ac, 50 Hz,6 00 VA each. Daily consumption is of the order of 7 kWh per system.
Monitoring : At the "Ponte Ginori" subsystem: irradiance
(Kipp & Zonen), temperature, currents, voltages, ecc. (about 16 data) are measured and stored as hourly averages on the hard disk of a personal computer. The data are collected every two month on a floppy disk for further processing.

Fields of science (EuroSciVoc)

CORDIS classifies projects with EuroSciVoc, a multilingual taxonomy of fields of science, through a semi-automatic process based on NLP techniques. See: The European Science Vocabulary.

This project has not yet been classified with EuroSciVoc.
Be the first one to suggest relevant scientific fields and help us improve our classification service

You need to log in or register to use this function

Programme(s)

Multi-annual funding programmes that define the EU’s priorities for research and innovation.

Topic(s)

Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.

Call for proposal

Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.

Data not available

Funding Scheme

Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.

DEM - Demonstration contracts

Coordinator

Sistemi Energetici Integrati
EU contribution
No data
Address
VIA SAN JACOPO 32
50047 PRATO
Italy

See on map

Total cost

The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.

No data
My booklet 0 0