Objetivo
The aim of the project is :
- to utilise high technolgy "solar skins" and windows to capture solar radiation and reduce heat losses;
- to integrate these systems with high efficiency heat recovery and the thermal storage of the fabric;
- to demonstrate the importance of solar friendly design at higher latitudes;
- to involve the student residents in the understanding and operation of energy matters.
The systems is integrated in apartments buildings for a total of 400 students. Each appartment is for 4 to 8 persons with single rooms and shared facilities, including kitchens.
The first heating season required more auxiliary heating than expected due to the drying out of the building structure (plaster and concrete) and difficulties with the ventilation system. Other preliminary results concern. Higher than expected dust penetration into the LEGIS wall which may be due to dust during construction or to atmospheric pollution since completion. The effect is being monitored and possible solutions are being investigated. The triple-glazed windows have insufficient ventilation in the cavity and this is causing condensation on the inside of the outer pane. It is anticipated that adjustments to the draught sealing will remove this affect. There have been problems with condensation in shower rooms and it is anticipated that modifications to the ventilation system will be required to increase air change rates in these rooms. It is recognised that occupants should have been better informed about the unusual features of the building and this may have led to unsympathetic use of heating, blinds and windows.
Finally there were delays in delivery of the blinds for the LEGIS wall and this will have resulted in lower U values during the night and hence lower room temperatures while resulting in overheating during long periods of sunshine. It is anticipated that blinds will have been installed by April/May 1991 and the improvements will be monitored during one full heating season.
The Design and Built Contractor was Kaiser Bautechnik Ltd and work started on site in June 1988. The buildings were occupied from March 1990. The buildings are aligned east-west across the south facing slope, unobstructed to the sun throughout the year. The main solar components are on the south facades where approximately 33% of the glazed are has double or triple-glazed windows with automatic roller blinds in between the glass and 66% of the area has an innovative solar skin developed at the Fraunhofer Institute and named the LEGIS system where solar radiation is transmitted through the outer glazing and across an air space containing roller blinds, through translucent insulation material (TIM) to be absorbed into a dark painted dense concrete wall. The window blinds and the LEGIS wall blinds are automatically controlled although the bedroom blinds have manual override to allow the occupants to control privacy. Normally the blinds will be open during the day to provide solar heating and closed at night to reduce heat loss. When the desired temperatures are reached during the day the blinds will automatically close. The buildings also have mechanical heat recovery ventilation systems and hot water is provided by gas fired boilers in the roof space. Bedrooms have auxiliary electric backup heating with time controlled switches.
Ámbito científico (EuroSciVoc)
CORDIS clasifica los proyectos con EuroSciVoc, una taxonomía plurilingüe de ámbitos científicos, mediante un proceso semiautomático basado en técnicas de procesamiento del lenguaje natural. Véas: El vocabulario científico europeo..
CORDIS clasifica los proyectos con EuroSciVoc, una taxonomía plurilingüe de ámbitos científicos, mediante un proceso semiautomático basado en técnicas de procesamiento del lenguaje natural. Véas: El vocabulario científico europeo..
Este proyecto aún no se ha clasificado con EuroSciVoc.
Sugiera los ámbitos científicos que considere más relevantes y ayúdenos a mejorar nuestro servicio de clasificación.
Para utilizar esta función, debe iniciar sesión o registrarse
Programa(s)
Programas de financiación plurianuales que definen las prioridades de la UE en materia de investigación e innovación.
Programas de financiación plurianuales que definen las prioridades de la UE en materia de investigación e innovación.
Tema(s)
Las convocatorias de propuestas se dividen en temas. Un tema define una materia o área específica para la que los solicitantes pueden presentar propuestas. La descripción de un tema comprende su alcance específico y la repercusión prevista del proyecto financiado.
Las convocatorias de propuestas se dividen en temas. Un tema define una materia o área específica para la que los solicitantes pueden presentar propuestas. La descripción de un tema comprende su alcance específico y la repercusión prevista del proyecto financiado.
Convocatoria de propuestas
Procedimiento para invitar a los solicitantes a presentar propuestas de proyectos con el objetivo de obtener financiación de la UE.
Datos no disponibles
Procedimiento para invitar a los solicitantes a presentar propuestas de proyectos con el objetivo de obtener financiación de la UE.
Régimen de financiación
Régimen de financiación (o «Tipo de acción») dentro de un programa con características comunes. Especifica: el alcance de lo que se financia; el porcentaje de reembolso; los criterios específicos de evaluación para optar a la financiación; y el uso de formas simplificadas de costes como los importes a tanto alzado.
Régimen de financiación (o «Tipo de acción») dentro de un programa con características comunes. Especifica: el alcance de lo que se financia; el porcentaje de reembolso; los criterios específicos de evaluación para optar a la financiación; y el uso de formas simplificadas de costes como los importes a tanto alzado.
Coordinador
G1 1XQ GLASGOW
Reino Unido
Los costes totales en que ha incurrido esta organización para participar en el proyecto, incluidos los costes directos e indirectos. Este importe es un subconjunto del presupuesto total del proyecto.