The aim of the GA-SP Project is to develop and test full scale, a subsea processing system that will facilitate economic development of small hydrocarbon reservoirs. The system will include well stream commingling, multiphase separation and pumping, and will be engineered to be suitable for a wide range of reservoir fluid properties, shallow or deep water application, with control from the surface from either a low cost in-field floating platform or an existing remote fixed installation.
Innovative aspects include:
a) Subsea closed loop modulating control of process parameters.
b) Hybrid diverless maintenance philosophy with vertical retrieval of insert components or complete modules.
c) Single datum alignment of valved multi-port module interconnection.
d) High and low pressure gas commingling in an ejector.
e) Variable speed export pump, turbine driven using ambient sea water as a power transmission fluid.
f) Nucleonic, capacitance and differential pressure instruments.
Accurate, stable, control was achieved of first stage pressure and first and second stage gas and oil interfaces under all steady state and transient conditions. Oil and water interface level control and second stage pressure control were less satisfactory. Most equipment worked reasonably well with the exception of the gas ejectors. The use of two stage separation is therefore not recommended at the present time.
The GA-SP Project which is also supported by a number of oil companies was executed in stages. The first stage, Front End Engineering and Preliminary Design, was concerned with outline definition of field scenario concepts and identification of major areas of novelty. The second stage, Detailed Design and Engineering , was concerned with development of a full scale prototype system which incorporates all of the key areas of novelty required to demonstrate the technical feasibility of the concept. The major tasks of this stage of work included:
i) Development of Process Flow Diagrams, General Arrangement Drawings and Piping and Instrument Diagrams.
ii) Building of Scale Models to show module details and interfaces.
iii) Preparation of functional specifications for all equipment, systems, fabrication and assembly requirements.
iv) Detailed engineering including hydraulic, mechanical and structural calculations, and preparation of drawings and schedules.
v) Specification of onhsore tests facility requirements including a conditioning plant to provide a flow of simulated crude oil at 15,000 b/d and 35 bar.
vi) Development of a computer simulation programme, to be used as a basis for predicting process/control response of the prototype, and subsequently, after correlation with test results, design of commercial systems.
The main components of the prototype system include:
a) Dummy Production Choke Module (PCM), with a single bay Secondary Distribution Module (SDM) incorporating the prototype Valved Multiported Connector (VCM).
b) Separator Module, for two stage three phase separation, including four types of level detector from three manufacturers, and four sets of modulating control valves with hydraulic actuators from two manufacturing groups.
c) Ejector skid unit, with two alternate ejectors for gas commingling; flow, pressure and temperature sensors, and (manual) recycle capabilities to the second stage separator and/or booster pump suction.
d) Power system, comprising 3.3 kV transformer, switchgearand cable with a sea water charge pump driven by 500 H.P. 3.3 kV synchronous motor. The high pressure water drives a turbine, coupled to the oil export booster pump. A modulating control valve bypasses water to control speed of the turbine/booster pump in response to separator level control.
e) Control and data monitoring system, comprising a topsides process control computer, a topsides data logging computer and printer, a topsides hydraulic power unit, a subsea pod for hydraulic fluid distribution and data transmission together with a variety of transducers, cables, connectors and junction boxes.
The third stage of the GA-SP Project included procurement of the prototype facility, factory acceptance testing of the main components, its installation in a dry dock, commissioning and operation using simulated wellhead fluid.

Fields of science (EuroSciVoc)

CORDIS classifies projects with EuroSciVoc, a multilingual taxonomy of fields of science, through a semi-automatic process based on NLP techniques. See: The European Science Vocabulary.

This project has not yet been classified with EuroSciVoc.
Be the first one to suggest relevant scientific fields and help us improve our classification service

You need to log in or register to use this function

Programme(s)

Multi-annual funding programmes that define the EU’s priorities for research and innovation.

Topic(s)

Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.

Call for proposal

Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.

Data not available

Funding Scheme

Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.

DEM - Demonstration contracts

Coordinator

Goodfellow Associates Ltd
EU contribution
No data
Address
124 Belgrave Road
SW1V 2BL London
United Kingdom

See on map

Total cost

The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.

No data
My booklet 0 0