Objetivo To install a 1.8 MW wind farm consisting of six 300 kW turbines on a remote island location, without conventional crane erection techniques. To demonstrate diesel fuel savings for the existing diesel generation facility. To build on the experiences of the 2.7 Dunkerque wind farm project by continuing the development of the Francisation of the WindMaster 300 kW turbine, by successful integration of French manufactured components. Redesign of existing turbine technology to facilitate shipment by means of standard containers i.e. a self-contained unit for application in remote regions. Design and implementation of self erection technology for application in remote regions. Delivery of advanced control and inverter technology for wind-diesel hybrid systems for application in remote regions. Ámbito científico engineering and technologyenvironmental engineeringenergy and fuelsliquid fuels Programa(s) FP4-NNE-THERMIE C - Specific programme for research and technological development, including demonstration in the field of non-nuclear energy, 1994-1998 Tema(s) 7 - WIND ENERGY Convocatoria de propuestas Data not available Régimen de financiación DEM - Demonstration contracts Coordinador WINDMASTER NEDERLAND BV Aportación de la UE Sin datos Dirección ZUIVERINGSWEG 26 8243 PZ LELYSTAD Países Bajos Ver en el mapa Coste total Sin datos