Skip to main content
Go to the home page of the European Commission (opens in new window)
English English
CORDIS - EU research results
CORDIS

Testing the Untestable: Model Testing of Complex Software-Intensive Systems

Objective

Software-intensive systems pervade modern society and industry. These systems often play critical roles from an economic, safety or security standpoint, thus making their dependability indispensible. Software Verification and Validation (V&V) is core to ensuring software dependability. The most prevalent V&V technique is testing, that is the automated, systematic, and controlled execution of a system to detect faults or to show compliance with requirements. Increasingly, we are faced with systems that are untestable, meaning that traditional testing methods are highly expensive, time-consuming or infeasible to apply due to factors such as the systems’ continuous interactions with the environment and the deep intertwining of software with hardware.
TUNE will enable testing of untestable systems by revolutionising how we think about test automation. Our key idea is to frame testing on models rather than operational systems. We refer to such testing as model testing. The models that underlie model testing are executable representations of the relevant aspects of a system and its environment, alongside the risks of system failures. Such models inevitably have uncertainties due to complex, dynamic environment behaviours and the unknowns about the system. This necessitates that model testing be uncertainty-aware.
We propose to develop scalable, practical and uncertainty-aware techniques for test automation, leveraging our expertise on model-driven engineering and automated testing. Our solutions will synergistically combine metaheuristic search with system and risk models to drive the search for critical faults that entail the most risk. TUNE is the first initiative with the specific goal of raising the level of abstraction of testing from operational systems to models. The project will bring early and cost-effective automation to the testing of many critical systems that defy existing automation techniques, thus significantly improving the dependability of such systems.

Fields of science (EuroSciVoc)

CORDIS classifies projects with EuroSciVoc, a multilingual taxonomy of fields of science, through a semi-automatic process based on NLP techniques. See: https://op.europa.eu/en/web/eu-vocabularies/euroscivoc.

You need to log in or register to use this function

Programme(s)

Multi-annual funding programmes that define the EU’s priorities for research and innovation.

Topic(s)

Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.

Funding Scheme

Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.

ERC-ADG - Advanced Grant

See all projects funded under this funding scheme

Call for proposal

Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.

(opens in new window) ERC-2015-AdG

See all projects funded under this call

Host institution

UNIVERSITE DU LUXEMBOURG
Net EU contribution

Net EU financial contribution. The sum of money that the participant receives, deducted by the EU contribution to its linked third party. It considers the distribution of the EU financial contribution between direct beneficiaries of the project and other types of participants, like third-party participants.

€ 2 307 932,00
Address
2 PLACE DE L'UNIVERSITE
4365 ESCH-SUR-ALZETTE
Luxembourg

See on map

Region
Luxembourg Luxembourg Luxembourg
Activity type
Higher or Secondary Education Establishments
Links
Total cost

The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.

€ 2 307 932,00

Beneficiaries (1)

My booklet 0 0