CORDIS provides links to public deliverables and publications of HORIZON projects.
Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .
Deliverables
This report will include the design technical specifications and data requirements of demonstrations linked to the Clean Energy Production Storage Supply Action The correlation of this action and demo cases with other actions and innovations will also be documented
Detailed requirements for the assessment method (opens in new window)Detailed requirements for the assessment model data needs and KPIs against which the PORTable innovations are tested Methodology for the assessment method and which data needs to be provided
Cross cooperation & synergies plan (early version) (opens in new window)A detailed overview explaining what are the initiatives PIONEERS is partnering with the added value to bring from such synergies and an evaluation of the impact of the concrete actions developed in T103 early in the project
Interim Actions Status Report (opens in new window)This report will detail the progress and initial performance results demos and actions against project objectives and expected impact for the lighthouse and each one of the fellow ports. It will also describe improvements to maximise impact to be used as feedback for WP4-WP7.
PIONEERS detailed project plan (opens in new window)The project plan will be drawn up early in the project and will identify important linkscritical paths between WP47 demonstrator tasks in order to maximise synergies and an efficient project planning The project plan will feed into the Cotransferability innovation and implementation framework and plan for cotransferabilityM12 as this will require a good understanding of the implementation timescales for the port pilot activities in order to assign them to either the first or second wave of transferability
Intermediate report on a decisionmaking system based on Vessel location (opens in new window)Documentation and preliminary conclusions of technical and economic implications of the decision-making system based on vessel location deployment in the demo.
Innovation assessment results of year 1 (opens in new window)The main innovation assessment results are summarised in a report after each year including an innovation radar map containing the assessment result in visual form including the potential impact and the associated timeline
Design report on the autonomous container shuttle solution (opens in new window)This report will detail the description of the solution incl designs subsystems and components specifications lit of software tools etc
Modal shift and flows optimization Scoping Document (opens in new window)This report will include the design technical specifications and data requirements of demonstrations linked to the Modal Shift and Flows Optimization Action The correlation of this action and demo cases with other actions and innovations will also be documented
International partners Legal and Ethical Compliance (opens in new window)This deliverable will specifically focus on the various compliance aspects for the international partners and will be an easy to use handbook for them as well as for the project coordinator throughout the project
PIONEERS Scenarios, Personas, Use Cases and Demonstration Requirements (opens in new window)This report will include the definition of PIONEERS scenarios involved personas and use cases It will also list Demonstration requirements in a structured Requirements Traceability Matrix
Project Management Plan - Mid-term Update (opens in new window)This deliverable will include an updated schedule per task responsible partner related subtasks related deliverables and dependencies on other tasks a Gantt chart a Work Breakdown Structure and Ethics requirements
Co-transferability innovation and implementation framework and plan for co-transferability (opens in new window)Detailed description of the CIIF framework how it is applied and plan for the Cotransferability process
State of the art of the European Green Ports Master Plans (opens in new window)This deliverable will provide the state of the art of the European Green Ports and the specific Masterplan measures and methodology developed of each port of the consortium
Digital Transformation Scoping Document (opens in new window)This report will include the design technical specifications and data requirements of demonstrations linked to the Digital Transformation Action The correlation of this action and demo cases with other actions and innovations will also be documented
Actions and Measures year 1 (opens in new window)Summary of the workshops organised for each Energy Transition segment and a list of the relevant actions and measures that ports have to implement in their GPMP towards a Green and sustainable Port
Data Management Plan – Mid-term Update (opens in new window)The Data Management Plan is a living document that should evolve during the course of the project. At the moment, only one version of the DMP is foreseen in the GA (D11.4). Two additional releases are envisaged that should improve the initial version delivered in Month 6. In the mid-term version of the deliverable in M18 (with the scope of the demonstrations closed), we will add the detail of the data that will be used in all the demonstrators and describe the role of each partner in the management of the data. In the final version in M54 (a couple of months later than the end of demos) we will report the actual data that has been used in all the demonstrations.
Port Stakeholder Analysis and End-User Needs (opens in new window)A report including the classification and inventory of an extended and comprehensive list of people institutions authorities and industries involved and influencing the smart portcity ecosystem and relative enduser needs
Sustainable Port Design Scoping Document (opens in new window)This report will include the design technical specifications and data requirements of demonstrations linked to the Sustainable Port Design Action The correlation of this action and demo cases with other actions and innovations will also be documented
Draft plan for exploitation and dissemination of project results (opens in new window)First version of the exploitation and dissemination strategy for the different PIONEERS results, aimed at maximising exposure and transferability of the innovations.
Decision Support Tool for lock planning (opens in new window)The deliverable will contain a set of algorithms ready for implementation in real port test cases.
Project Management Plan (opens in new window)This deliverable will include a schedule per task responsible partner related subtasks related deliverables and dependencies on other tasks a Gantt chart and a Work Breakdown Structure and Ethics requirements
Co-transferability monitoring report for the ‘first wave' (opens in new window)Reporting on the ‘first wave’ co-transferability appraisal and action plans, together with monitoring information on the actions pursued.
Port stakeholder mapping (opens in new window)Summary of the stakeholders relevant in the transition to the sustainable port of the future
Innovation assessment results of year 2 (opens in new window)The main innovation assessment results are summarised in a report after each year including an innovation radar map containing the assessment result in visual form including the potential impact and the associated timeline.
Communication and Dissemination strategy (opens in new window)The deliverable will elaborate the PIONEERS communication dissemination strategy and explain how the tools will be developed along the project duration
Community building programme design & implementation (opens in new window)This deliverable is meant to design and shape the PIONEERS community building of T104 together with the major contributors of the task defining the stakeholders to involve explaining how to engage them and detailing how to implement the actions established
State of the Art, Gaps and Challenges for Green Ports (opens in new window)This report includes the outcomes of a comprehensive study, based on desk research as well as interviews held with PIONEERS stakeholders regarding the State-of-the-Art, gaps and the European ports’ challenges, enablers and barriers in their effort to become Green Ports.
Baseline scenario (opens in new window)Report describing the business-as-usual scenario (BAU) in which the current trends related to Clean Energy Production, Storage & Supply, Port Efficiency, Modal shift and flows optimization and Digital Transformation are developed.
Quality Management Plan (opens in new window)This deliverable will present the project quality control strategy and a peer review system that will be followed towards all project deliverables and procedures
This deliverable will present the procedures and strategy to be followed in PIONEERS for data handing and to ensure that its research data is findable accessible interoperable and reusable It will include the principles for data processing the security measures to be implemented and the informed consent procedures in regard to data
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available