Resultado final
Summary of the workshops organised for each Energy Transition segment and a list of the relevant actions and measures that ports have to implement in their GPMP towards a Green and sustainable Port.
Clean Energy Production, Storage & Supply Scoping Document (se abrirá en una nueva ventana)This report will include the design technical specifications and data requirements of demonstrations linked to the Clean Energy Production Storage Supply Action The correlation of this action and demo cases with other actions and innovations will also be documented
Project Management Plan: second update (se abrirá en una nueva ventana)This deliverable will include an updated schedule per task, responsible partner related subtasks, related deliverables, and dependencies on other tasks, a Gantt chart and a Work Breakdown Structure and Ethics requirements.
Detailed requirements for the assessment method (se abrirá en una nueva ventana)Detailed requirements for the assessment model data needs and KPIs against which the PORTable innovations are tested Methodology for the assessment method and which data needs to be provided
Cross cooperation & synergies plan (early version) (se abrirá en una nueva ventana)A detailed overview explaining what are the initiatives PIONEERS is partnering with the added value to bring from such synergies and an evaluation of the impact of the concrete actions developed in T103 early in the project
Demo report on the Multimodal Connectivity Platforms' implementation (se abrirá en una nueva ventana)The report includes the conclusions of the demonstration and first operation phase for the different multimodal platforms.
Interim Actions Status Report (se abrirá en una nueva ventana)This report will detail the progress and initial performance results demos and actions against project objectives and expected impact for the lighthouse and each one of the fellow ports. It will also describe improvements to maximise impact to be used as feedback for WP4-WP7.
PIONEERS detailed project plan (se abrirá en una nueva ventana)The project plan will be drawn up early in the project and will identify important linkscritical paths between WP47 demonstrator tasks in order to maximise synergies and an efficient project planning The project plan will feed into the Cotransferability innovation and implementation framework and plan for cotransferabilityM12 as this will require a good understanding of the implementation timescales for the port pilot activities in order to assign them to either the first or second wave of transferability
Intermediate report on a decisionmaking system based on Vessel location (se abrirá en una nueva ventana)Documentation and preliminary conclusions of technical and economic implications of the decision-making system based on vessel location deployment in the demo.
Demo report on the autonomous container shuttle solution (se abrirá en una nueva ventana)This report will document all demonstration operation and provide a technical assessment of the solution’s performances.
Innovation assessment results of year 1 (se abrirá en una nueva ventana)The main innovation assessment results are summarised in a report after each year including an innovation radar map containing the assessment result in visual form including the potential impact and the associated timeline
Design report on the autonomous container shuttle solution (se abrirá en una nueva ventana)This report will detail the description of the solution incl designs subsystems and components specifications lit of software tools etc
Modal shift and flows optimization Scoping Document (se abrirá en una nueva ventana)This report will include the design technical specifications and data requirements of demonstrations linked to the Modal Shift and Flows Optimization Action The correlation of this action and demo cases with other actions and innovations will also be documented
International partners Legal and Ethical Compliance (se abrirá en una nueva ventana)This deliverable will specifically focus on the various compliance aspects for the international partners and will be an easy to use handbook for them as well as for the project coordinator throughout the project
PIONEERS Scenarios, Personas, Use Cases and Demonstration Requirements (se abrirá en una nueva ventana)This report will include the definition of PIONEERS scenarios involved personas and use cases It will also list Demonstration requirements in a structured Requirements Traceability Matrix
Co-transferability monitoring report for the ‘second wave' (se abrirá en una nueva ventana)Reporting on the ‘second wave’ co-transferability appraisal and action plans, together with monitoring information on the actions pursued.
Project Management Plan - Mid-term Update (se abrirá en una nueva ventana)This deliverable will include an updated schedule per task responsible partner related subtasks related deliverables and dependencies on other tasks a Gantt chart a Work Breakdown Structure and Ethics requirements
Demo report on automated vessels (se abrirá en una nueva ventana)Final demonstration of an automated barge, controlled by a remote-control centre, operating along the waterways between Antwerp-Willebroek and/or Antwerp-Venlo. Assessment of feasibility of the technology and benefits to the environment & society and to shippers and transport users.
Final report on a decisionmaking system based on Vessel location (se abrirá en una nueva ventana)Documentation and final conclusions of technical and economic implications of the decision-making system based on vessel location deployment in the demo.
Actions and policies for sustainable commute to the port (se abrirá en una nueva ventana)This report will summarize the lessons learned during the different actions implemented in the framework of the smart and sustainable commuting for port companies with the ambition to serve as a guide for other ports/cities that are interested in launching a similar project.
Demonstrator for real-time support traffic control (se abrirá en una nueva ventana)The deliverable will contain a set of algorithms ready for implementation in real port test cases.
Quantitative evaluation report of the Lighthouse port innovations (se abrirá en una nueva ventana)Report with conclusions on the LCPA net benefits of the innovations demonstrated in WP 4-7, based on the developed baseline and desired future scenario.
Co-transferability innovation and implementation framework and plan for co-transferability (se abrirá en una nueva ventana)Detailed description of the CIIF framework how it is applied and plan for the Cotransferability process
Demo report on the Cargo Flow Prediction (se abrirá en una nueva ventana)Evaluation report of the demo phase of the Cargo Flow Prediction tool, including links to the MIP and digital twin demo cases.
Innovation assessment results of year 4 (se abrirá en una nueva ventana)The main innovation assessment results are summarised in a report after each year including an innovation radar map containing the assessment result in visual form including the potential impact and the associated timeline.
State of the art of the European Green Ports Master Plans (se abrirá en una nueva ventana)This deliverable will provide the state of the art of the European Green Ports and the specific Masterplan measures and methodology developed of each port of the consortium
Digital Transformation Scoping Document (se abrirá en una nueva ventana)This report will include the design technical specifications and data requirements of demonstrations linked to the Digital Transformation Action The correlation of this action and demo cases with other actions and innovations will also be documented
Actions and Measures year 1 (se abrirá en una nueva ventana)Summary of the workshops organised for each Energy Transition segment and a list of the relevant actions and measures that ports have to implement in their GPMP towards a Green and sustainable Port
Data Management Plan – Mid-term Update (se abrirá en una nueva ventana)The Data Management Plan is a living document that should evolve during the course of the project. At the moment, only one version of the DMP is foreseen in the GA (D11.4). Two additional releases are envisaged that should improve the initial version delivered in Month 6. In the mid-term version of the deliverable in M18 (with the scope of the demonstrations closed), we will add the detail of the data that will be used in all the demonstrators and describe the role of each partner in the management of the data. In the final version in M54 (a couple of months later than the end of demos) we will report the actual data that has been used in all the demonstrations.
Port Stakeholder Analysis and End-User Needs (se abrirá en una nueva ventana)A report including the classification and inventory of an extended and comprehensive list of people institutions authorities and industries involved and influencing the smart portcity ecosystem and relative enduser needs
GPMP implementation strategy (se abrirá en una nueva ventana)Action plan of measures for each of the PIONEERS ports.
Sustainable Port Design Scoping Document (se abrirá en una nueva ventana)This report will include the design technical specifications and data requirements of demonstrations linked to the Sustainable Port Design Action The correlation of this action and demo cases with other actions and innovations will also be documented
Demo report on the MaaS Aggregator towards green mobility (se abrirá en una nueva ventana)Evaluation report on the CityTrips platform demo project, assessing the lessons learned and the achievement of KPI's.
Draft plan for exploitation and dissemination of project results (se abrirá en una nueva ventana)First version of the exploitation and dissemination strategy for the different PIONEERS results, aimed at maximising exposure and transferability of the innovations.
Decision Support Tool for lock planning (se abrirá en una nueva ventana)The deliverable will contain a set of algorithms ready for implementation in real port test cases.
Project Management Plan (se abrirá en una nueva ventana)This deliverable will include a schedule per task responsible partner related subtasks related deliverables and dependencies on other tasks a Gantt chart and a Work Breakdown Structure and Ethics requirements
Co-transferability monitoring report for the ‘first wave' (se abrirá en una nueva ventana)Reporting on the ‘first wave’ co-transferability appraisal and action plans, together with monitoring information on the actions pursued.
Port stakeholder mapping (se abrirá en una nueva ventana)Summary of the stakeholders relevant in the transition to the sustainable port of the future
Innovation assessment results of year 2 (se abrirá en una nueva ventana)The main innovation assessment results are summarised in a report after each year including an innovation radar map containing the assessment result in visual form including the potential impact and the associated timeline.
Communication and Dissemination strategy (se abrirá en una nueva ventana)The deliverable will elaborate the PIONEERS communication dissemination strategy and explain how the tools will be developed along the project duration
Community building programme design & implementation (se abrirá en una nueva ventana)This deliverable is meant to design and shape the PIONEERS community building of T104 together with the major contributors of the task defining the stakeholders to involve explaining how to engage them and detailing how to implement the actions established
Demo report full hydrogen straddle carrier (se abrirá en una nueva ventana)As a preparation to full zero-emission operations, a full hydrogen vehicle will be tested: comparison between a fuel cell system in combination with a battery pack versus a mono-fuel spark-engine with a battery pack. This report will summarize the test results.
State of the Art, Gaps and Challenges for Green Ports (se abrirá en una nueva ventana)This report includes the outcomes of a comprehensive study, based on desk research as well as interviews held with PIONEERS stakeholders regarding the State-of-the-Art, gaps and the European ports’ challenges, enablers and barriers in their effort to become Green Ports.
Innovation assessment results of year 3 (se abrirá en una nueva ventana)The main innovation assessment results are summarised in a report after each year including an innovation radar map containing the assessment result in visual form including the potential impact and the associated timeline.
Lighthouse port Digital Twin (se abrirá en una nueva ventana)The deliverable will contain all software components necessary for Digital Twin implementation in ports.
Baseline scenario (se abrirá en una nueva ventana)Report describing the business-as-usual scenario (BAU) in which the current trends related to Clean Energy Production, Storage & Supply, Port Efficiency, Modal shift and flows optimization and Digital Transformation are developed.
Quality Management Plan (se abrirá en una nueva ventana)This deliverable will present the project quality control strategy and a peer review system that will be followed towards all project deliverables and procedures
This deliverable will present the procedures and strategy to be followed in PIONEERS for data handing and to ensure that its research data is findable accessible interoperable and reusable It will include the principles for data processing the security measures to be implemented and the informed consent procedures in regard to data
Publicaciones
Autores:
Tillmann Stübler, Andrea Amodei, Domenico Capriglione, Giuseppe Tomasso, Nicolas Bonnotte, Shawan Mohammed
Publicado en:
Electrical Engineering and Systems Science, 2024