During the first 18 months of the project, Work Package 2 undertook the first round of stakeholder consultations that took place in the three DAs and the results were processed, presented and shared with the consortium (D2.1) in order to direct and guide ongoing work in other Work Packages. Simultaneously, Work Package 3 undertook an extensive, systematic literature review to explore existing Social-Ecological System (SES) frameworks (D3.1) with the aim of identifying and recommending an approach for the Marine SABRES project to create the Simple SES. Following this process, a comprehensive Simple SES Guidance Document (D3.2) was produced that aims to create a workbook that includes step by step guidance with examples, to be employed by the participant the project responsible for applying and testing the Simple SES in the DAs. A set of briefing papers was also produced, each addressing a key theme relevant to the Simple SES's conceptual characteristics and operational functions.
There is ongoing work for WP4 that is related to the baseline assessment of each DA's marine social ecological system of focus, the application and testing of transformation pathways scenarios and the testing measures for governance solutions. Although the associated deliverable is not due until Month 19, the work is almost complete and represents a large amount of effort during the first Reporting Period. Another task that was completed and will feed further into upcoming WP4 and WP5 objectives is task 5.1 of WP5, that is the identification of transformation needs (for consequent development and testing of possible pathways to transformation) in each DA, based on global SSP/RCP scenarios regionalized at demonstration area level using stakeholders worldviews.