Livrables
1st version of SYNERGIES Requirements and Detailed Architecture Design (R, PU, M12): Report on the end-user and business requirements (including an analysis of the socio-economic and regulatory barriers) and the project MVP, accompanied by the corresponding technical design and specifications of the individual components and integrated SYNERGIES solution.
Project Management PlanProject Management Plan R PU M3 Includes all project management procedures and templates a detailed technical implementation plan the risk assessment and ethics monitoring frameworks
SYNERGIES Dissemination, Communication and Engagement PlanA roadmap for the setup of the SYNERGIES living lab and the planning of the dissemination communication and engagement activities of the project It involves also the delivery of the initial communication material of the project
It will include the initial DMP along the FAIR principles and the corresponding roles of partners and resources to be utilized It is provided as a separate deliverable due to the strong datarelevant nature of the project Updates of the DMP will be provided as part of the Periodic Management Reports
Publications
Auteurs:
Rahul Nellikkath; Spyros Chatzivasileiadis
Publié dans:
2023 IEEE Belgrade PowerTech, 2023, ISSN 1803-7232
Éditeur:
IEEE
DOI:
10.1109/PowerTech55446.2023.10202770
Auteurs:
Sotirios Tsakalidis, George Tsoulos, Dimitrios Kontaxis and Georgia Athanasiadou
Publié dans:
Telecom, Numéro 4, 2023, ISSN 2673-4001
Éditeur:
Telecom
DOI:
10.3390/telecom4030026
Auteurs:
Rahul Nellikkath; Andreas Venzke; Mohammad Kazem Bakhshizadeh; Ilgiz Murzakhanov; Spyros Chatzivasileiadis
Publié dans:
ARXIV, 2023
Éditeur:
ARXIV
DOI:
10.48550/arXiv.2303.12116
Recherche de données OpenAIRE...
Une erreur s’est produite lors de la recherche de données OpenAIRE
Aucun résultat disponible