At system level (WP3), building of the activities started in the frame of Themis under ESA contract, the hop test campaign is being prepared and technical requirements for activities dedicated to maturing relevant technologies for the next Themis step (after SALTO) have been issued.
Technology maturation activities have been performed during the first period:
- Focusing on future launcher applicability (WP4), a mathematical formulation of the sizing of launchers considering reusability was developed. Concepts for the structural integration of landing legs and control surfaces were reviewed.
- Regarding aerodynamics and aerothermodynamics (WP5), the first loop of the aerodynamic design of the vehicle for the next phase after SALTO was performed. A first aerothermal and aerodynamic database was generated and gave important design input for the aeroshape.
- In WP6, several activities have been performed to prepare the next steps after SALTO: industrialization of ultra low-cost lightweight tank industrialization maturation and manufacturing a full scale prototype, investigation of low-cost bio-sources thermal protection and removable thermal back shield, design of low-cost Grid Fins Structure and Grid Fins Actuator System, development of a demonstrator of landing leg has been prepared for testing.
- On health monitoring and safety technologies (WP7), the structural health monitoring was advanced, the actuator health monitoring system was defined, the development of an algorithm for the health monitoring of the Hybrid Navigation System was started and the development of the Autonomous Flight Termination System was initiated.
- On avionics (WP8), definition of a preliminary On-board Avionics architecture for SALTO embarked experiments and start of design for the different building blocks.
- On propulsion technologies (WP10), design of autogenous pressurization solutions, attitude control system and green flip control systems has started.
Finally, the launch vehicle for the hop test campaign (WP9) and the ground systems necessary for the flight campaign (WP11) were adapted and prepared; work on the flight software has been done in order to prepare the flight of the launch vehicle.