Livrables
This deliverable is related to T52 and T53 Selection of ISOS accelerated aging protocol to study intrinsic and extrinsic cell stability CEA M3 among the aging conditions described and recommended in ISOS recommendation reference paper the available and most relevant aging procedures will be selected It will consider the most important factors light temperature and humidity single stress or combination In addtion of the accelerated aging outdoor test procedures will be also detailed
Quality Assurance ReportA Quality Assurance report will be compiled within T8.4 and delivered before the mid-term review at M18. This will ensure standards have been met, including a set of indicators for project evaluation on quality, impact, engagement, gender and equality, and share the use of these in relevant tools such as the Gender Equality Action Plan. Regular quality.
Report on carbon electrode with optimized conductivity and charge selectivity.This report will be a result of the development work on anode materials in Task 1.4. The carbon electrode should be highly conductive (<5 ohm/square) and chemically compatible with the underlying layers in a perovskite, i.e. not dissolve or react with the underlying layers. Moreover, the charge selectivity of the carbon layer should be tailored to promote - at the interface to perovskite - high extraction of holes whereas electrons are repelled without sustaining losses of the lateral conductivity of the carbon in its function as low-resistive back electrode.
Report on the first operation of novel developed MPPT with 100 channelsContinuous maximum Power Point Tracking of 100 solar cells over 100 hours continuous illumination will be demonstrated within T5.2. For this, adapted sample holders will be constructed, the according measurement electronics set up, data logging installed and software programmed and successfully tested.
Project Management HandbookThe Project Management Handbook PMH will be assembled within T84 Quality assurance and impact monitoring to ensure quality assurance processes for all project deliverables and published publications The PMH will also include a detailed Project Management Plan with a Gantt chart and a Work Breakdown Structure WBS
Report on optimized HTL and ETL for optimal junctionThis deliverable is related to T1.2. Optimized selective contacts passivate the interface with the perovskites and extract charge carriers without significant voltage losses.
Dissemination, exploitation and communication planThis deliverable reports the plan for the dissemination exploitation including communication PDEC activities within T71 and T72 of the DIAMOND project which will be delivered at M6 and updated at months 12 24 and 36 A project website will be developed and launched at the begin of the project M6 to further assist in the spreading of project news the wide perception of the goals and the consortium involved open access scientific publications will be made available The PDEC will consider the target audiences as central elements both academic and industrial during the three years of the project
The Data Management Plan DMP will be prepared in T83 based on FAIR principles defined by the EC The DMP will serve for an optimal identification storage labeling and distribution among the partners and ensure proper publication The DMP will be updated annually after first version in M6
Recherche de données OpenAIRE...
Une erreur s’est produite lors de la recherche de données OpenAIRE
Aucun résultat disponible