CORDIS fournit des liens vers les livrables publics et les publications des projets HORIZON.
Les liens vers les livrables et les publications des projets du 7e PC, ainsi que les liens vers certains types de résultats spécifiques tels que les jeux de données et les logiciels, sont récupérés dynamiquement sur OpenAIRE .
Livrables
This plan will include at an initial stage a precise and schematic description of the relevant tools / results established in previous projects (i.e. RESCCUE, CLARITY….) and how the project will make use of them and will innovate with respect to them. This is one of the results of task T6.2
WP2 lab testing results (s’ouvre dans une nouvelle fenêtre)Reporting describing tests performed, data used and obtained results. This is the result of task T2.4. Also, this deliverable is a requirement to achieve milestone 2
Stakeholders engagement plan (s’ouvre dans une nouvelle fenêtre)Report on the planned organization of the case studies CoPs and the local workshops. This is the first result of T5.4.
Climate projections and hazard data (s’ouvre dans une nouvelle fenêtre)Report on climate projections and hazard scenarios (at regional and local scale), including data/metadata information and datasets access for impact models testing and validation. This is the result of task T1.2.
Portfolio of adaptation solutions (s’ouvre dans une nouvelle fenêtre)Report and database about the adaptation solutions (RES-TEC3. Portfolio of adaptation solutions). This is the result of task T3.3.
Tangible impacts methods (s’ouvre dans une nouvelle fenêtre)Report describing the methods developed in T3.1
Holistic resilience methods (s’ouvre dans une nouvelle fenêtre)Deliverable on the methods for holistic resilience assessment improving and combining the tools from previous projects (mainly RESCCUE RAF tool and EU-Circle RAT tool) and expanfing them to include more climate hazards and different scales. It includes the RES-TEC2. Holistic climate resilience assessment tool. This is the result of task T3.2.
ICARIA holistic modelling framework (s’ouvre dans une nouvelle fenêtre)Includes description of the elementary bricks of the framework (i.e., space/time, hazard, exposure, vulnerability, dynamic vulnerability, impact, human behaviour). This is the result of task T1.1 - Risk/impact modelling framework
WP3 testing results (s’ouvre dans une nouvelle fenêtre)Reporting describing tests performed, data used and obtained results. This is the result of task T3.5. Also, this deliverable is a requirement to achieve milestone 2
Implementation plan and Risk contingency Plan – Version 2 (s’ouvre dans une nouvelle fenêtre)Updated version of the reporting on the implementation plan, and potential risks during the execution of the project and related recovery actions. This is one of the results of tasks T6.1 and T6.2.
Impact modelling data requirements and methods to treat data gap filling and data uncertainty (s’ouvre dans une nouvelle fenêtre)A “cookbook” explaining the data requirements, algorithms and approaches to treat data gaps and data uncertainties. Also includes taxonomies, database structure and data collection templates for modelling framework, Exposure Datasets, Vulnerability functions and impact modelling algorithms. This is the result of task T1.3.
Implementation plan and Risk contingency Plan – Version 3 (s’ouvre dans une nouvelle fenêtre)Updated version of the reporting on the implementation plan, and potential risks during the execution of the project and related recovery actions. This is one of the results of tasks T6.1 and T6.2.
Project Management Manual (s’ouvre dans une nouvelle fenêtre)The report includes the consortium bodies and their roles; summary of financial guidelines; reporting procedures and templates; partner contacts; templates, guidelines and reviewers of deliverables; etc. This is the first result of task T6.1. Also, this deliverable is a requirement to achieve milestone 1.
Implementation plan and Risk contingency Plan – Initial version (s’ouvre dans une nouvelle fenêtre)First version of the reporting on the implementation plan, and potential risks during the execution of the project and related recovery actions. This first version includes the framework for monitoring the achievement of project results / objectives, which will be used also to help to mitigate the identified and the new) critical risksThis is one of the results of tasks T6.1 and T6.2. Also, this deliverable is a requirement to achieve milestone 1
Trial design (s’ouvre dans une nouvelle fenêtre)A detailed description of the trial design (including the mini-trials) for each of the three case studies and a summary explaining the overall expectations, similarities and differences between them. This is the result of task T4.1
Holistic modelling framework for multi-hazards and related uncertainty analysis (s’ouvre dans une nouvelle fenêtre)Deliverable on multi- hazards interaction and interrelations description and methods to consider them in the modelling chain. This is the result of task T2.1.
Multi-hazard scenario building methods (s’ouvre dans une nouvelle fenêtre)Report on the mathematical model results to quantify the probabilities and uncertainties of combined and compound multi-hazards events. This is the result of task T2.2.
Dissemination and communication Plan - Initial version (s’ouvre dans une nouvelle fenêtre)Definition of the dissemination plan, presenting the results to be disseminated, the target groups and channels to get to them. This is the initial result of task T5.1, T5.2 and T5.3
WP1 lab testing results (s’ouvre dans une nouvelle fenêtre)Report describing the tests performed, the data used, and the results obtained. This is the result of task T1.4. Also, this deliverable is a requirement to achieve milestone 2
It includes the toolbox RES-TEC1. Multi-Hazard modelling tools and the documentation to use it. This is the first version of the result of task T2.3 that will be used later on in WP3 and WP4
Initial version will focus on data management strategy, including naming and metadata guidelines. The final version will update the draft one and will focus on post project use of data sets. This is the first result of task T6.3
Publications
Auteurs:
Ioannis Zarikos; Nadia Politi; Nikolaos Gounaris; Stelios Karozis; Diamando Vlachogiannis; Athanasios Sfetsos
Publié dans:
Water, Numéro 15(17), 2023, ISSN 2073-4441
Éditeur:
MDPI
DOI:
10.3390/w15173038
Auteurs:
Beniamino Russo; Àlex de la Cruz Coronas; Mattia Leone; Barry Evans; Rita Salgado Brito; Denis Havlik; Marianne Bügelmayer-Blaschek; David Pacheco; Athanasios Sfetsos
Publié dans:
Sustainabilit, Numéro 15 (9), 2023, ISSN 2071-1050
Éditeur:
MDPI
DOI:
10.3390/su151914090
Recherche de données OpenAIRE...
Une erreur s’est produite lors de la recherche de données OpenAIRE
Aucun résultat disponible