CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.
Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .
Resultado final
This is linked to Task 7.2. It will summarize the communication and dissemination strategy. The communication strategy will include the target audiences and defines the channels of communication, support material, activities, responsibilities, timing in detail.
Checklists for operational safety for the selected broad range of vessel types (se abrirá en una nueva ventana)This deliverable is linked to Task 1.1 and includes the definition of the safety requirements for an ESS installation on board from which ISSN will produce an operational safety checklist.
Revision of Communication and dissemination plan report (se abrirá en una nueva ventana)We have planned a revised version of the communication and dissemination plan in order to present the status of the activities
Components model of ESS, PMS/EMS, power consumers and mission profile (se abrirá en una nueva ventana)This deliverable refers to Task 2.1 and aims to create of high-level simulation components and Mission Profiles that will be used in the simulation models Task 2.2.
First version of operational profiles and ESS requirements for a broad range of vessels (se abrirá en una nueva ventana)This deliverable refers to Task 1.1 and aims to define operational profiles for a broad range of vessel types as well as to provide all relevant requirements as input for the definition of the use cases.
Verified and validated pre-design model (se abrirá en una nueva ventana)This deliverable refers to Task 2.4 and involves ensuring the viability of the developed controls and strategies through simulation with a digital twin. The result is a verification and validation of the preliminary design model.
Deliverable 5.2 is linked to Task 5.2 and involves the development of a scaled-down HIL test setup that enables the testing of the overall operational performance of the developed ESS.
Deliverable 5.1 is linked to Task 5.1 and includes the development of real-time simulation models for components of the ship power system.
Project website (se abrirá en una nueva ventana)This document is linked to Task 7.1. It will provide the establishment of a project corporate identity with a project website.
Publicaciones
Autores:
Mohsen Akbarzadeh, Syb Ten Cate Hoedemaker, Romain Tessard, Remi De Coster, Zhenmin Tao, Jeroen Stuyts
Publicado en:
Transport Transitions: Advancing Sustainable and Inclusive Mobility (TRAconference 2024), 2025
Editor:
Springer
DOI:
10.1007/978-3-031-89444-2_67
Autores:
S. Mamarikas, S. Spyridopoulos, F. Sellier, N. Aletras, A. Papakostas, and L. Ntziachristos
Editor:
Not avaible yet
Autores:
David Hernández-Torres, Zhenmin Tao, Franck Sellier
Publicado en:
2025 IEEE/AIAA Transportation Electrification Conference and Electric Aircraft Technologies Symposium (ITEC+EATS), 2025, ISSN 2473-7631
Editor:
IEEE
DOI:
10.1109/ITEC63604.2025.11098088
Autores:
Guven Ogus, Remi de Coster, Zhenmin Tao, Mohsen Akbarzadeh, Grigorios Koltsakis, Stephan Schlimpert
Publicado en:
2024 IEEE Vehicle Power and Propulsion Conference (VPPC), 2025, ISSN 2769-4186
Editor:
IEEE
DOI:
10.1109/VPPC63154.2024.10755239
Autores:
Sam Weckx, Ankit Surti, Zhenmin Tao
Publicado en:
Batteries, Edición 11, 2025, ISSN 2313-0105
Editor:
MDPI AG
DOI:
10.3390/BATTERIES11100381
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles