European Commission logo
español español
CORDIS - Resultados de investigaciones de la UE
CORDIS

Thermal energy storage solUtions to optimally Manage BuildingS and Unlock their grid balancing and flexibility Potential

Resultado final

Assessment of the existing monitoring and control infrastructure and guidelines for THUMBS-UP Integration

This report compiles the results of Task 11 and 12 integrating an analysis of the existing monitoring systems of demo and validation sites including a preliminary simulation to confirm the size of the TES solutions Besides the deliverable includes an analysis of the modifications needed to implement in CARTIF III in order to allow the integration of TES systems to be validated Finally a set of guidelines about existing regulations and health and safety aspects with indications to minimize risks during the integration of the TES solutions in residential and terciary buildings will be included

Dissemination and Stakeholders’ engagement Plan and D&C material (website, leaflet, poster etc.)

Communication and dissemination of the THUMBS UP results to the scientific and technical community as well as to the general public to raise awareness towards the technology guarantying a high level of acceptance to obtain a quick market uptake

Buscando datos de OpenAIRE...

Se ha producido un error en la búsqueda de datos de OpenAIRE

No hay resultados disponibles