Skip to main content
Ir a la página de inicio de la Comisión Europea (se abrirá en una nueva ventana)
español español
CORDIS - Resultados de investigaciones de la UE
CORDIS

Compatibility Assessment of Non-steel metallic Distribution gas grid materials with Hydrogen

CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.

Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .

Resultado final

Data Management Plan (se abrirá en una nueva ventana)

The Data Management Plan (DMP) consist of a brief plan to define what data sets the project will generate or process, whether and how these data will be made accessible, and how they will be curated, stored and preserved. The DMP should also provide information on the measures taken to safeguard and protect sensitive data. The datamanagement plan must address the following issues: 1. Making data Findable 2. Making data openly Accessible 3. Making data Interoperable 4. Increase data Re-use 5. Allocation of recourses and data security The data management plan will also have to specify if certain datasets remain closed and the reasons for not giving access should be given (for instance, if one of the project objectives would be jeopardised by providing open access to certain data or some of the generated data are considered sensitive, etc.). If necessary, the DMP will be updated in the Midterm Report (D1.3) and/or in the Final Report (D1.4). The DMP will be updated regularly as necessary if requested by the funding authority.

Inventory of non-steel metallic materials of the natural gas distribution grid (se abrirá en una nueva ventana)

Technical report considering the data collection about the non-steel metallic materials used in the natural gas distribution grid according to the main findings collected in T2.1

Communication and Dissemination Plan (CDP) (se abrirá en una nueva ventana)

A detailed Communication and Dissemination Plan (CDP) containing, at least, the following elements: a) The identification and classification of the stakeholders to be targeted, establishing a characterisation of their needs in the design of the most suitable strategy for each of them, b) Communication strategies to the wider public and stakeholders that are not specifically targeted for dissemination (media, trade associations, wider public), c) The dissemination methods and their associated activities and tools to reach the expected impact, like the project website, conferences, workshops, publications, d) Dissemination procedures according to the Grant Agreement (GA) and the Consortium Agreement (CA) and e) Schedule and complementarities of the dissemination activities among the partners.The dissemination and communication plan should be updated as necessary. The Clean Hydrogen JU may require the submission of an updated Dissemination and Communication Plan on an annual basis

Updated CDP (se abrirá en una nueva ventana)

First update on the CDP, highlighting the main achievements at that time and necessary adaptations if any.The dissemination, exploitation and communication plan should be updated as necessary. The Clean Hydrogen JU may require the submission of an updated Dissemination, Exploitation and Communication Plan on an annual basis.

Review of hydrogen embrittlement phenomena and mechanisms (se abrirá en una nueva ventana)

Report with results on the literature review about hydrogen dissociation, solubility and diffusion in non-steel metallic materials.

Definition of experimental campaign: Round Robin test and individual testing (se abrirá en una nueva ventana)

Key aspects of the experimental campaign and its planning, including the number of specimens, protocol for acquisition and preparation of testing samples, kind of tests with their methodology and operating conditions (level of hydrogen, pressure, etc.)

Mapping and gap analysis on the testing and evaluation of the compatibility of metallic materials with hydrogen (se abrirá en una nueva ventana)

Technical report describing the outcomes of the Codes, Standards and Guidelines, related projects outcomes and technical literature review according to the activities performed in T2.2 and T2.3

Midterm publishable summary report (se abrirá en una nueva ventana)

Deliverable report including a summary of data reported to knowledge management of Clean Hydrogen Partnership

Publicaciones

Inventory of non-steel metallic materials of the natural gas distribution grid (se abrirá en una nueva ventana)

Autores: Rodriguez, Cristina; Cerezo, Alberto; Soileux, Emilie; Di Vito, Luigi; Martínez Izquierdo, Lidia; Gil, Vanesa; Parro, Marcos; Martínez, Juan Carlos
Publicado en: 2024
Editor: Zenodo
DOI: 10.5281/ZENODO.14929861

Buscando datos de OpenAIRE...

Se ha producido un error en la búsqueda de datos de OpenAIRE

No hay resultados disponibles

Mi folleto 0 0