South Marmara Hydrogen Shore

CORDIS provides links to public deliverables and publications of HORIZON projects.

Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .

Deliverables

Report on opening conference (opens in new window)

Report on opening conference and feedback obtained

Branding Kit (opens in new window)

Graphic design plan and logo

Requirements definition report (opens in new window)

For the facility design, procurement and installation, first a requirements list and related report will be prepared and released

Feasibility Report of Large-scale Green Ammonia Plant (opens in new window)

TAU will conduct a feasibility study for the production of another hydrogen derivative: green ammonia, if the technical and economic terms are reasonable for a large-scale green methanol plant, it is planned to make the investment during the project implementation. The potential investor is İÇDAŞ (steel producer).

Feasibility Report of Large-scale Green Methanol Plant (opens in new window)

TAU will conduct a feasibility study for the Green Methanol Plant. Regarding the results of the feasibility study, if the technical and economic terms are reasonable for a large-scale green methanol plant, it is planned to make the investment during the project implementation. The potential investors are Enerjisa Üretim, and Akçansa Çimento. The produced methanol is planned to be transferred to two different locations in South Marmara, where most of the material will be used as a feedstock in the process of wood-based panel production and a small fraction of green methanol will be used in the production of boron-based chemicals. The production of this special boron chemical needs both methanol and pure hydrogen in the process.

Dissemination and Communication Plan (opens in new window)

The dissemination, exploitation and communication plan should be updated as necessary. The Clean Hydrogen JU may require the submission of an updated Dissemination, Exploitation and Communication Plan on an annual basis

Yearly Impact report on organised workshops 1 (opens in new window)

Information on Workshops organised and feedback obtained in Y1

Risk Management Register (opens in new window)

Project Coordinator will perform the project risk analysis, identifying risks and proposing mitigation strategies. Risk factors and dependencies will be identified. For each identified risk, there will be a proposed prevention plan and/or necessary action plan. Foreseen risks will be continuously monitored, and any potential unforeseen risks will be notified promptly to the PC/SC to take quick remedy actions.

Digital press-kit about HYSouthMarmara (opens in new window)

Press information about the Hydrogen valley to be used by all partners.

Yearly Impact Reports on social media accounts 1 (opens in new window)

Analytics of the social media accounts for Y1

Data Management Plan (opens in new window)

DMP will include information on: i) the handling of research data; ii) what data will be collected, processed and generated; iii) applied methodology & standards; iv) shared vs. made open access; v) data preservation (also after the end of the project). PwC will draft a first version of the DMP and will update it as data sets are produced during the project.