Skip to main content
Go to the home page of the European Commission (opens in new window)
English en
CORDIS - EU research results
CORDIS

INCREASED FLEXIBILITY OF ATCO VALIDATIONS – V3

CORDIS provides links to public deliverables and publications of HORIZON projects.

Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .

Deliverables

V1 STAND (Final) (opens in new window)

Proposed SESAR input to standardisation activities (e.g. EUROCAE).

V1 TS/IRS (Final) (opens in new window)

The TS/IRS document provides the functional, non-functional and interface requirements related to a SESAR Solution. The technical specifications address the “what” and not the “how”, they aim at specifying the functional description and the necessary logical interfaces between the SESAR Solution and other parts of the ATM system.

V1 REG (Final) (opens in new window)

Proposed SESAR acceptable means of compliance to EASA to illustrate means to establish compliance with the SES basic regulation and its implementing rules.

V1 Contextual Note (opens in new window)

The contextual note provides to any interested reader (external and internal to the SESAR programme) an introduction to the SESAR Solution in terms of scope, main operational and performance benefits, relevant system impacts, etc. When a SESAR Solution is at TRL6 level it contains as well recommendations regarding additional activities to be conducted during the industrialization phase or as part of deployment.

V1 SPR-INTEROP / OSED (Final) (opens in new window)

The SPR-INTEROP/OSED contains the safety and performance requirements and interoperability requirements related to a SESAR Solution that has been defined and validated in the context of the OSED, which describes the applicable environment, assumptions, etc. As appendix, it includes the transversal assessments and the performance assessment report that justify the SPR-INTEROP requirements (e.g. safety, human performance, etc).

Communication, Dissemination and Exploitation Plan (Initial) (opens in new window)

The CDE plan describes a detailed communication dissemination and exploitation strategy setting the objectives messaging target audiences communication channels social media plan planned budget and relevant indicators for monitoring and evaluation

Communication, Dissemination and Exploitation Plan (Interim) (opens in new window)

The CDE plan describes a detailed communication, dissemination and exploitation strategy, setting the objectives, messaging, target audiences, communication channels, social media plan, planned budget and relevant indicators for monitoring and evaluation.

V1 VALR (opens in new window)

The validation report consolidates the validation results for a SESAR ATM Solution or the SESAR Technological Solution once the validation activities for a given maturity level have been completed.

Data Management Plan (Interim) (opens in new window)

Data Management Plan (DMP) describes the data management life cycle for the data to be collected, processed and/or generated by IFAV3 project.

Data Management Plan (Initial) (opens in new window)

Data Management Plan DMP describes the data management life cycle for the data to be collected processed andor generated by IFAV3 project

Publications

Flexible Air Traffic Controller Deployment with Artificial Intelligence based Decision Support: Literature Survey and Evaluation Framework (opens in new window)

Author(s): Jana Meier, Michael Finke, Oliver Ohneiser, Mohsan Jameel
Published in: 2024
Publisher: Deutscher Luft- und Raumfahrtkongress (DLRK)
DOI: 10.25967/630258

Searching for OpenAIRE data...

There was an error trying to search data from OpenAIRE

No results available

My booklet 0 0