CORDIS - EU research results
CORDIS

Smart, Aware, Integrated Wind Farm Control Interacting with Digital Twins (ICONIC)

Project description

Innovative control system improves wind farm efficiency

Wind turbine farms represent a promising renewable energy solution, aligning with the goals of the green deal. However, the advancement of this solution is hindered by the necessity for enhanced batteries and improved turbine efficiency. The EU-funded ICONIC project is committed to developing a groundbreaking, state-of-the-art wind-farm control system, accompanied by physical and digital tools that will pave the way for significant breakthroughs. This system is anticipated to increase power production by up to 20 % and annual energy production by up to 5 %. Furthermore, it is expected to reduce the levelised energy cost by 6 % through improved efficiency and reduced expenses. The system will incorporate artificial intelligence, digital twins and data-enhanced technologies.

Objective

ICONIC aims to develop innovative physical and digital tools to achieve fundamental breakthroughs for the integrated control of wind farms, considering the whole physical system at farm, turbine, and component levels, in particular the complex aerodynamic interactions among turbines. ICONIC aims to increase farm-wide power production by 15-20% under optimal wind speeds and directions for typical wind farms suffering from wake effects, with a 3%-5% increase in annual energy production (AEP) considering all working conditions over the long term. It targets an LCOE reduction of at least 6% compared with the state-of-the-art control tools deployed in the current wind industry by improving farm-wide AEP and reducing operation & maintenance costs via leveraging the latest AI and digital technologies. Extensive validations for the integrated wind farm control solutions will be conducted via high-fidelity simulation models, experiments at a national-level wind tunnel, historical operational data at BP’s and C-Power’s wind farms, a unique collection of test rigs for critical turbine components at respective companies, and real-world wind farm field tests at C-Power. ICONIC’s integrated wind farm control system will contain (1) novel AI-based wind farm control system to unlock wind farms’ full potential; (2) novel data-enhanced wind turbine controllers to fulfil farm-level commands while balancing power generation and load mitigation; (3) an integration with digital twins (DTs) as extra support to improve control and reduce costs, which contains a first-ever farm-level DT for wind farm flow systems replicating detailed physical flow fields and an innovative turbine-level DT with critical component models for loading and lifetime estimations; (4) extensions of the solutions to future 20MW turbines. ICONIC will establish new knowledge and industrial leadership in key digital, enabling and emerging technologies, and deliver next-generation tools for wind farm operation.

Coordinator

UNIVERSITEIT GENT
Net EU contribution
€ 788 750,00
Address
SINT PIETERSNIEUWSTRAAT 25
9000 Gent
Belgium

See on map

Region
Vlaams Gewest Prov. Oost-Vlaanderen Arr. Gent
Activity type
Higher or Secondary Education Establishments
Links
Total cost
€ 788 750,00

Participants (10)

Partners (4)