The second year have allowed the achievments of several steps of Enlighten ED project:
- WP1: Key Subsystems
- Laser Ignition System (LIS), M3 test has been prepared actively and the HW for this test manufactured. The interface of the laser with the Thrust Chamber has been defined and CFD simulation to improve the ingition reliability have been performed.
- Gaz Generator Valve (VG): Both Preliminary Design Review (PDR) and Manufacturing Readiness Review (MRR) were successfully passed. A major change of design of the body of the valve has been impelmented in between these 2 reviews. Manufacturing of the actuators and of the valves parts have started.
- Nozzle extension (NE): Analysis of the results cold test campaign has been performed and Manufacturing Readiness Review (MRR) was successfully passed.
- Thrust Chamber Assembly (TCA): Detailed design of the thrust chamber and its measurement plan has progressed significantly during this period and HW from another TCA has been disassembled and is ready to be reused for Enlighten ED TCA.
-WP2: Maturation of additive manufacturing technologies
- Large-scale printers PBF-LB, the demo part definition has been finished and printing of the part has started.
- Laser Metal Deposition powder (LMD-p) for nozzle, the liner mock-up part has been built and several post-processing activities have been performed. Finalization of the postprocessing is planne during RP3. Jacket development has started, some test have been peformed to optimize the process parameters and limits the deformations of the jacket.
- Exhaust lines: Thermo-mecanical simulations have been performed as well as the manufacturing of the 2 exhaust lines to be installed on Enlighten engine. Post-processing operations as well as materail characterisation have started and will continue during RP3.
- Laser Powder Bed Fusion of Multi Materials: Several pre and post processing activities have been done to increase the maturity and knowledge on the fusion of the 2 differents materials. A valve anchor housing demonstrator has been designed and manufactured completely.
- WP3: Health Monitoring System (HMS)
- Important work has been performed to select the HW to be used to answer to HMS performance need and constraints coming from the REEC chassis. Definition of the HW in term of calculator, carrier board, I/F, harnesses has been done as well as the selection of the MCU firmware.
- Investigation on different software solution have been performed to identify the errors during start-up transient and steady flight. They allowed to select the most performant ones.
- For steady state SW detection, transfer of knwoledge between Proekspert and EdgX has been completed.
- Several technical investigations and methodological improvements were carried out during the reporting period about the machine learning pipeline (FDD pipeline).
- WP4: Engine Demo Plateform:
- Detailed design of the engine integration components is available and has been delivered to manufacturing teams.
- Preparation of the assembly of the engine has started by checking the layout of the engine with MAIT team. Elements to be reused from another test engine have been dismountled and sefely stored.
- Test campaign preparation has started focusing at first on the I/F between the bench and the engine and detailed measurement plan has started.
- Procurement of Green H2 has been analysed to select the GH2 to be commanded for the hot firing test
- WP5: Communication, dissemination & exploitation
- Several communications have been done on the project via webstie update and newletters. Preparation of upcoming events during RP3 has also started.
- Exploitation activities was limited to the identification of the member for Innovative Advisory Board (IAB). Though, EAB sessions have been held in frame of ENlighten project.
- WP6: Overall management of the project and coordination of the consortium performed during the period