CORDIS provides links to public deliverables and publications of HORIZON projects.
Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .
Deliverables
Physical twin of a selected Demonstrator in NL for stakeholder communication & database linked to task 12.1.
D8.1 Rating system for blue infrastructure (opens in new window)Workflow to attribute credits to blue infrastructure (non-validted) linked to task 8.1
The design of eco-dike concepts linked to task 15.2.
D15.1 Bioreceptive cement (opens in new window)Development of bioreceptive cementious material for dike construction linked to task 15.1.
D11.1 Numerical demonstrators (opens in new window)Calibrated XBeach/AeoLis numerical models of selected D demonstrators with XBeach/AeoLis linked to task 11.1.
Distribution maps of important species under current and future environmental conditions linked to task 4.2.
D1.2 Data Management Plan (opens in new window)Report outlining how data will be collected/ handled/ stored according to the FAIR principles linked to task 1.3.
D9.1 multi-use potential framework (opens in new window)report on stakeholder involvement linked to task 9.1
D4.3 Socio-economic boundary conditions (opens in new window)GIS layers of socio-economic and administrative conditions linked to task 4.3.
D7.2 Extreme safety boundary conditions (opens in new window)Boundary conditions of extreme storms, including for climate change scenarios linke dto task 7.2
D7.1 Demonstrator design (opens in new window)study and catalogue design parameters linked to task 7.1
D4.1 Physical boundary conditions (opens in new window)GIS layers of important physical parameters under current environmental conditions linked to task 4.1.
D1.1 Project management handbook (opens in new window)Living report describing the project & risk management, assurance procedures, including templates for progress and financial reporting linked to task 1.1 and 1.2.
D16.2 Stakeholder engagement strategy (opens in new window)Report on stakeholder involvement linked to task 16.3.
D6.3 Environmental influences (opens in new window)Correlation of boundary conditions with D6.1 and D6.2 to see potential connections.
D16.3 Connecting to EU and Global projects (opens in new window)Report on the connecting activities (months 1-18) linked to task 16.5.
D16.1 Plan for dissemination and Exploitation, including Communication activities (PDEC) (opens in new window)PDEC linked to task 16.1.
Description and quantification of vegetation coverage and correlation with D6.1 linke dto task 6.2.
D6.1 Digital Terrain Maps (opens in new window)Description and quantification of vegetation coverage and correlation with D6.1 lined to task 6.1.
Publications
Author(s):
Mahmoud Abouhalima, Luciana das Neves, Francisco Taveira-Pinto, Paulo Rosa-Santos
Published in:
Journal of Marine Science and Engineering, Issue 12, 2024, ISSN 2077-1312
Publisher:
MDPI AG
DOI:
10.3390/JMSE12040638
Author(s):
Björn Mehrtens, Leon Vinkelau, Thea Bölker, Oliver Lojek, Lukas Ahrenbeck, Constantin Schweiger, Viktoria Kosmalla, David Schürenkamp, Nils Goseberg
Published in:
Journal of Waterway, Port, Coastal, and Ocean Engineering, Issue 151, 2025, ISSN 0733-950X
Publisher:
American Society of Civil Engineers (ASCE)
DOI:
10.1061/JWPED5.WWENG-2138
Author(s):
Marine Vandenhove, Bruno Castelle, Alexandre Nicolae Lerma, Vincent Marieu, Vincent Mazeiraud
Published in:
Geomorphology, Issue 482, 2025, ISSN 0169-555X
Publisher:
Elsevier BV
DOI:
10.1016/J.GEOMORPH.2025.109758
Author(s):
Nicolas Robin, Olivier Raynal, Yann Balouin, Camille René, Eric Palvadeau, Nico Valentini
Published in:
Journal of Coastal Research, Issue 113, 2025, ISSN 0749-0208
Publisher:
Coastal Education and Research Foundation
DOI:
10.2112/JCR-SI113-026.1
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available