Skip to main content
Go to the home page of the European Commission (opens in new window)
English en
CORDIS - EU research results
CORDIS

Safe and Efficient Use of Sustainable Fuels in Maritime Transport Applications

CORDIS provides links to public deliverables and publications of HORIZON projects.

Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .

Deliverables

Data management plan (updated version 1) (opens in new window)

Data management plan (rules, guidelines, procedures for storage, protection, publicizing of project data). The DMP will be updated regularly at the end of the reporting periods.Related to tasks T1.1 and T1.2; four versions: M6, M18, M36 and M48.

Data management plan (initial version) (opens in new window)

Data management plan (rules, guidelines, procedures for storage, protection, publicizing of project data). The DMP will be updated regularly at the end of the reporting periods.Related to tasks T1.1 and T1.2; four versions: M6, M18, M36 and M48.

Report on preliminary risk evaluation (initial version) (opens in new window)

Preliminary risk evaluations of developed concept designs. Two versions, 1st on M12, final on M20.Related to task T7.2.

Dissemination and communication report (updated version 1) (opens in new window)

Initial and periodically updated project D&C strategy including EAB establishment, updated throughout the project. Related to tasks T9.3 and T9.4; four versions: M6, M18, M36 and M48

Report on GAP and risk assessment models (opens in new window)

Report on credible risk assessment methods and their evaluation. Risk assessment for proposed SAF powertrain configurations. Related to task T7.1.

Project handbook (initial version) (opens in new window)

Management structure, work plan, Gantt chart, progress monitoring, budget, QA/QC plan. The Project Handbook will be updated whenever necessary.Related to tasks T1.1 and T1.2; two versions: M4 and M48.

Report on demonstrator requirements and planning (opens in new window)

Report on boundaries of retrofitted SAF powertrain, including specific requirements, safety aspects, timetable, resulting in choice between LH2 and CGH2.Related to task T2.1.

Report on synergies with relevant research projects (initial version) (opens in new window)

Report on the interaction with other relevant Horizon and Hydrogen Europe projects.Related to task T9.2; two versions: M12 and M48

Report on development of Smart MCDM tools for SAFs (opens in new window)

Report on tools developed that assist design engineers to select retrofit/new building technologies. Related to task T5.2.

Dissemination and communication report (initial version) (opens in new window)

Initial and periodically updated project D&C strategy including EAB establishment, updated throughout the project. Related to tasks T9.3 and T9.4; four versions: M6, M18, M36 and M48

Report on the development of digital thread evaluation tools (opens in new window)

Report on digital simulation model for ship operations to estimate fuel and emission performances.Related to task T5.3

Report on life-cycle cost analysis (opens in new window)

Report on comparative LCCA results amongst assessed technologies and implemented solutions for the demonstrator and desktop studies.Related to task T8.2.

Report on collection and digital integration of monitoring systems (opens in new window)

Report on system requirements and system architecture of digital platform on MATLAB toolboxRelated to task T5.1.

Report on environmental expectations and regulations (opens in new window)

Report on regulatory framework and environmental expectations from different SAF power train configurations against compliance.Related to task T2.3.

Report on the definition and data requirements for the desktop studies (opens in new window)

Definition of desktop study vessels and specification of their operating scenarios, including performance impact, maturity level and possible bottlenecks.Related to task T2.2.

Report on preliminary risk evaluation (final version) (opens in new window)

Preliminary risk evaluations of developed concept designs. Two versions, 1st on M12, final on M20.Related to task T7.2.

Report on performance evaluation criteria for demonstrator, desktop studies (opens in new window)

Report on defined techno-, socio-, environmental and economic KPIs evaluating solutions for demonstrator and desktop studies.Related to task T2.4.

Searching for OpenAIRE data...

There was an error trying to search data from OpenAIRE

No results available

My booklet 0 0