Report on preliminary risk evaluation (initial version)
(se abrirá en una nueva ventana)
Preliminary risk evaluations of developed concept designs. Two versions, 1st on M12, final on M20.Related to task T7.2.
Dissemination and communication report (updated version 1)
(se abrirá en una nueva ventana)
Initial and periodically updated project D&C strategy including EAB establishment, updated throughout the project. Related to tasks T9.3 and T9.4; four versions: M6, M18, M36 and M48
Report on GAP and risk assessment models
(se abrirá en una nueva ventana)
Report on credible risk assessment methods and their evaluation. Risk assessment for proposed SAF powertrain configurations. Related to task T7.1.
Project handbook (initial version)
(se abrirá en una nueva ventana)
Management structure, work plan, Gantt chart, progress monitoring, budget, QA/QC plan. The Project Handbook will be updated whenever necessary.Related to tasks T1.1 and T1.2; two versions: M4 and M48.
Report on demonstrator requirements and planning
(se abrirá en una nueva ventana)
Report on boundaries of retrofitted SAF powertrain, including specific requirements, safety aspects, timetable, resulting in choice between LH2 and CGH2.Related to task T2.1.
Report on synergies with relevant research projects (initial version)
(se abrirá en una nueva ventana)
Report on the interaction with other relevant Horizon and Hydrogen Europe projects.Related to task T9.2; two versions: M12 and M48
Report on development of Smart MCDM tools for SAFs
(se abrirá en una nueva ventana)
Report on tools developed that assist design engineers to select retrofit/new building technologies. Related to task T5.2.
Dissemination and communication report (initial version)
(se abrirá en una nueva ventana)
Initial and periodically updated project D&C strategy including EAB establishment, updated throughout the project. Related to tasks T9.3 and T9.4; four versions: M6, M18, M36 and M48
Report on the development of digital thread evaluation tools
(se abrirá en una nueva ventana)
Report on digital simulation model for ship operations to estimate fuel and emission performances.Related to task T5.3
Report on life-cycle cost analysis
(se abrirá en una nueva ventana)
Report on comparative LCCA results amongst assessed technologies and implemented solutions for the demonstrator and desktop studies.Related to task T8.2.
Report on collection and digital integration of monitoring systems
(se abrirá en una nueva ventana)
Report on system requirements and system architecture of digital platform on MATLAB toolboxRelated to task T5.1.
Report on environmental expectations and regulations
(se abrirá en una nueva ventana)
Report on regulatory framework and environmental expectations from different SAF power train configurations against compliance.Related to task T2.3.
Report on the definition and data requirements for the desktop studies
(se abrirá en una nueva ventana)
Definition of desktop study vessels and specification of their operating scenarios, including performance impact, maturity level and possible bottlenecks.Related to task T2.2.
Report on preliminary risk evaluation (final version)
(se abrirá en una nueva ventana)
Preliminary risk evaluations of developed concept designs. Two versions, 1st on M12, final on M20.Related to task T7.2.
Report on performance evaluation criteria for demonstrator, desktop studies
(se abrirá en una nueva ventana)
Report on defined techno-, socio-, environmental and economic KPIs evaluating solutions for demonstrator and desktop studies.Related to task T2.4.