CORDIS provides links to public deliverables and publications of HORIZON projects.
Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .
Deliverables
Task 1.1A report containing detailed project management plan including a risk register and quality manual to ensure the effective management of the project. The report will also contain details of the project intranet.
Adaption of numerical model for condition investigation (opens in new window)Task 5.1A report describing the adaptation of the high-fidelity Wavepiston numerical model for condition investigations and the impact on modelling uncertainty.
Fundamental analysis of alternative configurations (opens in new window)Task 7.1A report containing the analysis of the alternative configurations and justification for the selection of the preferred configuration.
Reliability framework and analysis (opens in new window)Task 6.3A report detailing the reference framework for reliability assessment and the parameters for the baseline analysis.
Period 1 review of dissemination, communication and innovation (opens in new window)Task 17.1A report that details the dissemination and communication activities completed in Period 1 and contains an updated dissemination and communication plan. The report also details the implementation of the innovation strategy in Period 1, together with details of any updates to the innovation strategy.
Adaption of numerical model for control design (opens in new window)Task 4.1A report describing the adaptation of the high-fidelity Wavepiston numerical model for control strategy design and the impact on modelling fidelity and uncertainty.
Wave-to-wire model of Wavepiston (opens in new window)Task 3.2A report describing the implementation of the wave-to-wire numerical model that has been update to be suitable for the inclusion of dynamic passive control.
Identification of condition signatures (opens in new window)Task 5.2A report on the development of the machine learning tool and the condition signatures that can be used to identify a deterioration in performance.
Optimisation of control strategy (opens in new window)Task 4.2A report detailing the process of optimisation and the expected performance of the dynamic passive controller, with the purpose of minimising the LCOE.
Baseline lifecycle impacts (opens in new window)Task 6.1A report detailing the potential baseline lifecycle impacts that will be used to support the application of ‘circularity by design’.
Dissemination, communication, and exploitation plan (opens in new window)Task 17.1A report that contains the dissemination, communication, and exploitation plan
Front-end engineering design (opens in new window)Task 7.2A report containing the details of the front-end engineering design of the hydraulic system, including supporting details, calculations and how ‘circularity by design’ has influenced the final design.
Period 1 review of project and data management plans (opens in new window)Task 1.1A report containing details on project activities and the project progress against the plan. The report will also contain a review of the project management plan with an updated risk register.
Innovation strategy (opens in new window)Task 17.2A report that describes the strategy to be used in the project for management of innovation.
Model for analysis of weather-window (opens in new window)Task 6.4A report detailing the development of the weather-window model and the analysis of their impact on the LCOE.
Hydraulic network model (opens in new window)Task 3.1A report describing the implementation of the hydraulic network model and the proposed parameterisation. The report will also detail the capabilities of the hydraulic model in identifying the potential for production of critical hydraulic events.
Task 9.2The first prototype of the controller valve evidenced by photos of all parts individually and assembled.
Fabricated prototype pump (opens in new window)Task 8.2The first prototype of the hydraulic pump evidenced by photos of all parts individually and assembled.
Task 1.2A report containing the data management plan, which details all data sets that are expected to be generated, and how they will be stored securely and made available to other users.
Publications
Author(s):
Pedro Fornaro, Eugenio M. Gelos, John V. Ringwood
Published in:
Proceedings of the European Wave and Tidal Energy Conference, Issue 16, 2025, ISSN 2706-6940
Publisher:
European Wave and Tidal Energy Conference
DOI:
10.36688/EWTEC-2025-918
Author(s):
Pedro Fornaro, Zechuan Lin, Eugenio M. Gelos, John V/ Ringwood
Published in:
Proceedings of the European Wave and Tidal Energy Conference, Issue 16, 2025, ISSN 2706-6940
Publisher:
European Wave and Tidal Energy Conference
DOI:
10.36688/EWTEC-2025-890
Author(s):
Carrie Anne Barry, Peter Conlon, John Ringwood
Published in:
Proceedings of the European Wave and Tidal Energy Conference, Issue 16, 2025, ISSN 2706-6940
Publisher:
European Wave and Tidal Energy Conference
DOI:
10.36688/EWTEC-2025-883
Author(s):
Eugenio M. Gelos, Pedro Fornaro, Colm Fitzgerald, John V. Ringwood
Published in:
Proceedings of the European Wave and Tidal Energy Conference, Issue 16, 2025, ISSN 2706-6940
Publisher:
European Wave and Tidal Energy Conference
DOI:
10.36688/EWTEC-2025-964
Author(s):
Colm J. Fitzgerald, Eugenio Gelós, Emiel Schut, Steen Grønkjær Thomsen, John Ringwood
Published in:
Proceedings of the European Wave and Tidal Energy Conference, Issue 16, 2025, ISSN 2706-6940
Publisher:
European Wave and Tidal Energy Conference
DOI:
10.36688/EWTEC-2025-941
Author(s):
Simon Leboucher, Colm J. Fitzgerald, John V. Ringwood
Published in:
Applied Ocean Research, Issue 161, 2025, ISSN 0141-1187
Publisher:
Elsevier BV
DOI:
10.1016/J.APOR.2025.104679