Objectif
The present project provides the necessary support to the EEGI Team gathering, in a structured and organised way, a team of top level players (research centres, SMEs, universities, in close coordination with ENTSO-e and EDSO for SG) to design in a coordinated way with both TSOs and DSOs a set of accompanying activities to make sure that the EEGI will pass through the critical 2012-2014 period (preparation of FP8, initial operation of ACER, increased specification duties of the network operators) when dealing with the most complex electricity system in the world and to address the five remaining critical issues (costs, benefits, KPIs, knowledge sharing and financing) in involving all the stakeholders, to ensure the rational, fluid and stable EEGI workflow, as to reach safely the 2020 European goals.
Thème(s)
Appel à propositions
FP7-ENERGY-2011-1
Voir d’autres projets de cet appel
Régime de financement
CSA-SA - Support actionsCoordinateur
20134 Milano
Italie
Voir sur la carte
Participants (12)
Participation terminée
1210 Vienna
Voir sur la carte
1000 Bruxelles / Brussel
Voir sur la carte
1040 Bruxelles / Brussel
Voir sur la carte
31192 Mutilva Alta Navarra
Voir sur la carte
06560 Valbonne
Voir sur la carte
7465 Trondheim
Voir sur la carte
2400 Mol
Voir sur la carte
5400 Baden
Voir sur la carte
3000 Leuven
Voir sur la carte
28015 Madrid
Voir sur la carte
1030 Bruxelles / Brussel
Voir sur la carte
1210 Wien
Voir sur la carte