Objectif
Nowadays, wind power has an increasing share in the electricity generation mix in several European countries. Due to the intermittent nature of wind, the large-scale integration of wind power causes several difficulties in the management of a power system. Often, a high level of reserves is allocated to account for wind power variability, thus reducing the benefits from the use of wind energy.
Today it is widely recognized by end-users such as Transmission System Operators, utilities a.o. that forecasts of the power output of wind farms up to 48 hours ahead contribute to a secure and economic power system operation. The FP5 project ANEMOS (ENK5-CT-2002-0665) has successfully developed research on new forecasting techniques for a wide range of end-user requirements. The aim of the ANEMOS.PLUS proposal is to fully integrate the forecasts and their uncertainty into the management and decision support tools.
Champ scientifique
Appel à propositions
FP6-2005-TREN-4
Voir d’autres projets de cet appel
Régime de financement
STREP - Specific Targeted Research ProjectCoordinateur
PARIS
France
Voir sur la carte
Participants (21)
PAMPLONA
Voir sur la carte
KGS. LYNGBY
Voir sur la carte
ROSKILDE
Voir sur la carte
FREDERICIA
Voir sur la carte
DUBLIN
Voir sur la carte
PARIS
Voir sur la carte
26129 OLDENBURG
Voir sur la carte
RUNGSTED KYST
Voir sur la carte
OLDENBURG
Voir sur la carte
SARRIGUREN
Voir sur la carte
PORTO
Voir sur la carte
ATHENS
Voir sur la carte
OLDENBURG
Voir sur la carte
HERAKLION
Voir sur la carte
(ALCOBENDAS) MADRID
Voir sur la carte
LISBOA
Voir sur la carte
BELFAST
Voir sur la carte
GETAFE (MADRID)
Voir sur la carte
POINTE À PITRE
Voir sur la carte
STOCKHOLM
Voir sur la carte