Objetivo
CommONEnergy focuses on existing shopping malls to be refurbished and buildings with a different original function, redesigned to become shopping malls. Wholesales&Retail buildings represent 28% of the total non-residential building stock (BPIE, 2010), accounting for approximately 157 Mtoe in 2005 (EU EEAP). Considering typical shopping malls high impact on modern society (ICSC, 2008), the project addresses their transformation as lighthouses of energy efficient architectures and systems as well as assessment transparency.
CommONEnergy has the objective to re-conceptualize shopping malls through deep retrofitting, develop a systemic approach made of technologies and solution sets as well as methods and tools to support their implementation and to assess their impact in a life cycle approach. The main concept to advance the state-of-the-art is the shift from single-action refurbishment to deep retrofitting, with a systemic performance-driven approach including: integrated design process guidelines, integrative modelling environment, energy-economic evaluation tools, lean construction and management procedures, continuous commissioning approach, environmental and socio-cultural impact assessment.
The Systemic Retrofitting Approach (SRA) allows to achieve the foreseen targets: up to factor 4 reduction of energy demand, power peaks shaving and 50% increased share of renewable energy source favoured by the intelligent energy management and effective storage. 10 to 20 systemic solution-sets will be developed, demonstrating the widest replication of the cases investigated during the project. These outstanding energy performances will be achieved with short pay-back times (below 7 years) and high indoor environmental quality, with industrial conceptualization of the solutions and implementation tools. Organisation of technical workshops for relevant stakeholders contributes to create a generation of skilled practitioners and promote a domino effect to exploit benefits.
Ámbito científico
Tema(s)
Convocatoria de propuestas
FP7-2013-NMP-ENV-EeB
Consulte otros proyectos de esta convocatoria
Régimen de financiación
CP-IP - Large-scale integrating projectCoordinador
39100 Bolzano
Italia
Ver en el mapa
Participantes (22)
50019 SESTO FIORENTINO
Ver en el mapa
28033 MADRID
Ver en el mapa
47151 Boecillo
Ver en el mapa
1040 Wien
Ver en el mapa
24040 Stezzano (Bg)
Ver en el mapa
7034 Trondheim
Ver en el mapa
8020 GRAZ
Ver en el mapa
6072 ALDRANS
Ver en el mapa
1040 Bruxelles / Brussel
Ver en el mapa
S4 7QQ Sheffield
Ver en el mapa
33100 Udine
Ver en el mapa
16129 Genova
Ver en el mapa
800 08 GAVLE
Ver en el mapa
80686 Munchen
Ver en el mapa
6130 Schwaz
Ver en el mapa
20138 Milano
Ver en el mapa
14122 Irakleio
Ver en el mapa
79650 SCHOPFHEIM
Ver en el mapa
02017 Warszawa
Ver en el mapa
70569 STUTTGART
Ver en el mapa
47001 Valladolid
Ver en el mapa
6650 SURNADAL
Ver en el mapa