CORDIS - Résultats de la recherche de l’UE
CORDIS

Breakthrough solutions for adaptable envelopes for building refurbishment

Livrables

Fourth year´s performed Communication activities

According to the Initial Communication plan, the objective of this Deliverable is describing whole communication activities developed during the fourth year.

Second year´s performed communication activities

According to the Initial Communication plan the objective of this Deliverable is describing whole communication activities developed during the second year

BRESAER system conceptual design and methodology for a systemic building refurbishment

This deliverable is the result of the activities carried out in Task 22 It will define the conceptual design of the system the methodology to achieve a systemic building refurbishment overview the representative base cases to apply the system and the conceptual energy stratategies for its implementation

Future standardization proposals

This deliverable is the result of the activities of Task 7.1.Standarization, with the objective of facilitate through standardization the acceptance and utilization by the market of the developed solution. The deliverable will summarize the outcomes of the project into future new or revised standards so they can be easily found and used by the European or international industry sector and will present a list of specific standardization proposals. These proposals will fit the standardization procedures and requirements to be ready for inclusion in the development of future new standards or into revised ones.

Third year´s performed Communication activities

According to the Initial Communication plan the objective of this Deliverable is describing whole communication activities developed during the third year

Guides for installation, commissioning and maintenance of BRESAER system

This deliverable is the final result of the activities carried out in Task 4.1. It is the guides for installation, commissioning and maintenance of BRESAER system.

Logistics efficiency and initial installation analysis of BRESAER system

This deliverable is the first result of the activities carried out in Task 41 It is the validation of the BRESAER system in terms of production transport workshop assembling onsite installation and maintenance

Business models definition

This deliverable will present different proposals of suitable business models that could support the commercialization of BREASAER project result. The deliverable will include also a summary of the result of the validation activities proposed in Task 7.5. The selected business models will be subject a “light” business plan (D7.17) that will also be a central part of the Exploitation Plan.

Current status of the real demonstrator with monitored results

This deliverable will collect the preliminary status of the demonstration building prior to intervention including monitoring results of a full one year.

Performance assessment in real buildings with simulated interventions

This deliverable is the result of the activities carried out in Task 6.8. BRESAER system will be evaluated by the implementation of the envelope system at model level in four virtual demo buildings.

First year´s performed communication activities

According to the Initial Communication plan the objective of this Deliverable is describing whole communication activities developed during the first year

Report on existing standards and standardization landscape

This deliverable is the result of the activities of Task 71Standarization with the objective of facilitate through standardization the acceptance and utilization by the market of the developed solution The deliverable will present an identification of related applicable standards by identifying the existing standards and the ongoing developments at European and international levels applicable to BRESAER solution It is proposed at the very beginning of the project as it will constitute an important output that could influence the technical definition of the BRESAER system and its components

Final year´s performed communication activities

According to the Initial Communication plan, the objective of this Deliverable is describing whole communication activities developed during the last year and the conclusions of all project.

BRESAER system tested and validated

This deliverable is the result of the activities carried out in Task 37 It is the validation of the BRESAER system under CPDs standards

Performance assessment of the real demonstration

This deliverable is the result of the activities carried out in Tasks 6.2 and 6.7. It will collect the evaluation of the real demonstrator through measurements and energy modelling, inluding analysis of possible causes for any divergence between measured and calculated results.

BRESAER system costs and payback calculations

This deliverable is the final result of the activities carried out in Task 2.4. It will define an update and refinement of the initial calculations once the envelope components are optimized and enhanced.

Preliminary constructive design

This deliverable is one of the result of the activities carried out in Task 31 32 33 34 and 35 It will define the preliminary constructive design for each envelope component structural elements of faade and roof lightweight industrialized ventilated faade module multifunctional insulation panels combined solar thermal air and PV envelope component and dynamic window

Building Energy Management System (BEMS) definition

This deliverable will collect all the developments carried out in Task 51 It will be defined all the requirements of the BEMS the ICT solutions for system controlling the data model and the external systems integration

Final report on the interaction with standardization system

This deliverable is the final result of the activities of Task 7.1.Standarization, with the objective of facilitate through standardization the acceptance and utilization by the market of the developed solution. The deliverable will resume the activities and feedback collected from the interaction with the standardization technical committees (TCs) related with the project in order to improve the development and the exploitation strategy of the project, checking the feasibility and guide the characteristics of a future standardization of the project results.

First report on the interaction with the standardization system

This deliverable is related to the activities of Task 71Standarization with the objective of facilitate through standardization the acceptance and utilization by the market of the developed solution The deliverable will resume the activities and feedback collected during the first 36 months of the project from the interaction with the standardization technical committees TCs related with the project in order to improve the development and the exploitation strategy of the project checking the feasibility and guide the characteristics of a future standardization of the project results

Initial costs and payback calculations for the demonstration locations

This deliverable is the result of the initial activities carried out in Task 24 It will define the initial estimation of the economic impacts of the system when used in a retrofitting project

2nd version of the Data Management Plan

The objective of the 2nd version is to update the initial Data Management Plan in order to finetune it to the data generated and the uses identified by the consortium since not all data or potential uses are clear from the start

Final version of the Data Management Plan

This deliverable provides the final version of the Data Management Plan, implemented by the consortium.

BRESAER system potential in Europe based on the Geo-clusters analyses

This deliverable is the result of the activities carried out in Task 25 It is the development of Geocluster maps to indicate the BRESAER technology impacts potential and its applicability

Design guide and computer tool refined

This deliverable will be the second version of the D2.3 after a refinament process of the computer tool once used during the design phase of the demonstration stage to develop in WP6.

Publications

BRESAER Soluciones innovadoras para la renovación de envolventes adaptables

Auteurs: Imanol A. Peña, Ane Miren A. Aranzasti, Andrew Ferdinando, Isabel L. Azpeitia, Alejandro M. Barreiro
Publié dans: EESAP 8 Final Proceedings, 2017
Éditeur: Universidad del País Vasco

Considerations for extending benefits of energy retrofits at the building level to the building stock

Auteurs: Isaac Guedi Capeluto, Carlos Ochoa
Publié dans: PLEA 2017 Final Proceedings, 2017, ISBN 978-0-9928957-5-4
Éditeur: NCEUB 2017

Estudio de transferencia de calor en los puntos de anclaje a forjado de una subestructura de fachada ventilada

Auteurs: Beñat A. Goikolea, Roberto G. Martinez, Alberto R. Lacasta, Daniel C. Villegas
Publié dans: Comunicación presentada al III Congreso Edificios Energía Casi Nula, Numéro August 2016, 2016
Éditeur: Congreso EECN

Caracterización experimental del comportamiento térmico-energético de actuaciones de rehabilitación de envolventes por el exterior

Auteurs: Roberto Garay
Publié dans: Proceedings of the conference: 7º Congreso Europeo sobre Eficiencia Energética y Sostenibilidad en Arquitectura y Urbanismo; Universidad del País Vasco., Numéro 4-6 July 2016, 2016
Éditeur: Donostia-San Sebastian,

BEMS para control inteligente de fachadas ventiladas

Auteurs: Víctor I. Serna, José L. Hernández, Álvaro Corredera, Roberto Sanz, Francisco J. Miguel, Jesús García
Publié dans: Proceedings of the Conference: II Congreso Edificios Inteligentes, Numéro October 2015, 2015, Page(s) 106-112, ISBN 978-84-608-2793-1
Éditeur: Grupo Tecma Red S.L.

Estudio de transferencia de calor en los puntos de anclaje a forjado de una subestructura de fachada ventilada

Auteurs: Beñat Arregi and Roberto Garay, Alberto Riverola and Daniel Chemisana
Publié dans: III Congreso Edificios Energía Casi Nula, Numéro 21-22 June 2016, 2016, Page(s) 114-119, ISBN 978-84-608-8686-0
Éditeur: Madrid

Hybrid numerical and experimental performance assessment of structural thermal bridge retrofits

Auteurs: Garay, Roberto
Publié dans: Journal of Facade Design and Engineering, Vol 6, Iss 2, Pp 095-106 (2018), Numéro 1, 2018
Éditeur: TU Delft Open Journals
DOI: 10.7480/jfde.2018.2.2206

A Fuzzy-Based Building Energy Management System for Energy Efficiency

Auteurs: José Hernández, Roberto Sanz, Álvaro Corredera, Ricardo Palomar, Isabel Lacave
Publié dans: Buildings, Numéro 8/2, 2018, Page(s) 14, ISSN 2075-5309
Éditeur: MDPI AG
DOI: 10.3390/buildings8020014

Dynamic performance assessment of multidimensional heat transfer in Buildings

Auteurs: Roberto G. Martinez, Daniel C. Villegas
Publié dans: Numéro November 2017, 2017
Éditeur: Universitat de Lleida

BEMS: Remote Home Control

Auteurs: José L. Hernández
Publié dans: CARTIF newsview, Numéro "#15, November/December 2015", 2015, Page(s) 10-13
Éditeur: CARTIF Research Centre

European’s BRESAER project. Design and development of an industrialized envelope system for building refurbishment

Auteurs: José L. Hernández, Álvaro Corredera
Publié dans: FuturEnergy, Numéro "#31, June 2016", 2016, Page(s) 39-41, ISSN 2340-261X
Éditeur: Saguenay S.L.

Recherche de données OpenAIRE...

Une erreur s’est produite lors de la recherche de données OpenAIRE

Aucun résultat disponible