Deliverables Documents, reports (8) 1.3 Specifications Drafting of the specifications for the production of FREEWAY. 4.2.b Planing of Sales Representatives Planning of the encounters of FREEWAY Sales Representatives with distributors in France and in Europe 1.2 Outsourcing strategy Report on the analysis of the outsourcing strategy of FREEWAY SAS. 4.2.a List of retailers List of potential retailers in France and in Europe 2.1.b Selected sub-contractors List of the selected subcontractors with evaluation report for each. 4.2.c Reports of Sales Representatives Reports further to their encounters with distributors 5.7.b Interim reports project interim report (profgress and financial) 2.2 value enfineering Report of the value engineering for FREEWAY Demonstrators, pilots, prototypes (3) 2.4 Standard prototype Adapted production lines and FREEWAy standard prototype 1.1.c Optimized prototype Optimized prototype of FREEWAY 1.1.b Final definition plan Final definition plan including photos, specifications, testing report, etc. Other (2) 5.1 Communication plan Communication plan adapted to the commercialisation strategy 5.5 Prpject dashboards Updated dashboard on project progress from M2 to M22 every 2 month Websites, patent fillings, videos etc. (4) 2.1.a call for tender Launch of a call for tender applying EU procurements rules, for the production of FREEWAY 5.4.a Events participation Participation to 6 events in Europe (Eurobike, foire de Paris and other local ones) 1.1.d one scientific arrticle One scientific article on the use of flax fiber in mechanics 4.1 Dissemination Material Dissemination material in several languages Searching for OpenAIRE data... There was an error trying to search data from OpenAIRE No results available