The work performed from the beginning of the project until the end of the first period lead to the definition, first steps of products developments and preliminary testing of:
• Work on a Beacon Hardware and Firmware Platform able to meet SGB Specifications, including Return Link capability;
• Work on the definition and feasibility of the Satcom Recorder, including an Aviation Emergency Locator Transmitter, associated to an high speed aircraft fuselage antenna
• Work on the definition and development of the Maritime Emergency Positioning Indication Radio Beacon (EPIRB)
• Work on the definition and development of the Maritime Emergency Positioning Indication Radio Beacon (EPIRB)
The work performed during the second period lead to the design of the technologies and products with several product definition requirements revisions, testing and approval certification processes (when applicable), for all the expected results as follows:
For approved products:
• One Aviation Distress Tracking Emergency Locator Transmitter (ELT(DT)): Designed and in Verification
• One high speed aircraft fuselage antenna for Distress Tracking: Designed and in Verification
• One Maritime Emergency Positioning Indication Radio Beacon range (EPIRB with RLS): Designed, Verified and in Validation
• One Maritime and Land applications Personal Locator Beacon range (PLB with RLS): Designed, Verified, Validated, Submitted for approvals to Authorities
Combined for Aviation with the development of the White Supplementary Type Certificate for the retrofit market and upgrades of aircraft configurations.
Non-approved products for technology demonstrations:
• SGB Beacon demonstrator design and testing
• The Emergency Locator Transmitter able to meet future Remote Command via RLS (ELT(DT) Remote Activation capable beacon): Designed and verified
• One Satcom Recorder ELT Hardware platform and aircraft fuselage antenna to be able to broadcast aircraft flight data parameters, combined with distress alerts: Designed and verified
The Consortium worked, in conflict with the Covid-19 pandemic, during the third and last period on:
- The completion of the EPIRB COSPAS-SARSAT Type Approval process
- The completion of the Industrialization process implementation and validation of the PLB Fast Find Return Link
- The additional Design activities and Lab testing of the EL(DT) system after a new revision of the D1.1 document.
- The dissemination activities for Aviation and Maritime products introduction
- SGB performances: demonstrated and reassessed with the available SG System maturity in Europe.
- ELT(DT) Transmitter and Fuselage Antenna in an aircraft for Flight Tests and System validation.