Deliverables
Report on the specification and documentation about the AEOLIX Ecosystem dashboard for the demonstrators that enables track, monitor, and visualize the data flow provided by the connected logistic systems and devices to the AEOLIX Ecosystem. (M27)
New and revised general requirements"These requirements will be divided into two main groups devoted to the functional requirements (that define specific behaviour or functions and with a focus on the utility) and non-functional requirements (that define the quality and general behaviour of the actors involved in the system operations). More important, this is a ""living"" document that will be continuously updated during the project life (M18)"
AEOLIX Project dissemination material (leaflet, poster, presentation, newsletter)The project will develop project dissemination material such as leaflet, poster and presentation
Market opportunities, barriers and solutions and deadlineReport summarising main findings from stakeholder consultations and providing a deep in-sight into the current market conditions.
Specification for certification framework for the AEOLIX platformAEOLIX ecosystem technical architecture specification
Report on the design and specification of the technical architecture of the AEOLIX along with the detailed technical specification of each of its components. (M18)
Logistics Business Needs and Data Identification Report - Public VersionThe Logistics Business Needs and Data Identification Report defines the business needs for data, the sources of such data and the format available and format needed. It describes the user interfaces, be it the link to the in-house computer or the need for a specific user interface to be developed within the Intelligent Dashboard
Assessment of AEOLIX market penetrationAssessment of AEOLIX market penetration will present industry take up indices for the AEOLIX system. (M32)
AAEOLIX socio-economic evaluationAEOLIX socio-economic evaluation, will describe the evaluation of the impacts of the AEOLIX project on society and the environment
AEOLIX API and SDKOpen specification of the API and SDK to enable AEOLIX participants to engage and create new pan-EU apps developed for the demonstrators and innovate through online collaboration. AEOLIX API and SDK are released as Open Source. (M24)
AEOLIX Living Labs impact assessmentAEOLIX Living Labs impact assessment, will present the results living lab evaluation
Lesson learned: barriers and enablers of the solutions proposed in the pastThe report brings a clear vision of the technical and non-technical elements that led a previous solution to either success or to failure. (M17)
AEOLIX evaluation frameworkwill define the framework for assessing the impacts of the AEOLIX project
Pan-European and local eventsPan EU campaigns will be organised in order to promote the solutions of AEOLIX. ( M6, M12, M18, M24)
Guidelines for high level architecture for collaborative data exchangeAEOLIX Architecture for Collaborative Data Exchange; Complete overview of the high level governance architecture related to the integration, securing,management of data flows and organization within AEOLIX. The deliverable sharing the basic data at M24 and final at M36.
Cost benefit AnalysisAn in-depth cost-benefit analysis will be developed. This analysis will take into account costs and benefits for each business and user groups (fleet operators, shippers, service providers) to be a part of AEOLIX, to offer their services through the platform or to use service from other providers.
European Logistics Information Exchange” Innovation Platform marketing planA marketing plan for the European Innovation platform will be developed
AEOLIX Collaborative Business Partnership ReportThe AEOLIX Collaborative Business Partnership Report describes the confirmed set of logistics partners and official agencies that will collaborate to improve supply chain performance across specified corridors.
Implemented AEOLIX architecture across 12 LLConcurrent with the relevant Milestone to be achieved, the Deliverable describes the actual implementation approach taken and the solution sets implemented per LL.
Guidelines for an AEOLIX framework for legal trusted interoperable and high quality data exchangeAEOLIX Communication plan and yearly reporting on impact of communication activities
This report will yearly report on impact of communication activities and also provide a list of events the project will disseminate the results.( M12, M24, M36 )
Report about the best practices for AEOLIX collaborative data exchangeCollaborative Business model scenarios
All identified business models will be presented through a report at the end of the project. Draft versions of BMCs will however be developed based on the MVP, in the first year of the project and will be revised at least in two additional iterations, before the final report is prepared. (M24, M36)
Data Management PlanThis report will be developed by ERTICO to analyse how data will be handled during the project.
AEOLIX Living Lab 12LL12 has stared late in 2018 after the period 1 was done and the AEOLIX Amendment was approved- and all tasks foreseen for the period 1 for any Living Lab will be done by the new LL 12. Therefore a deliverable related to this is planned to be delivered by M36.
AEOLIX quick win impacts& Business Paradigm Shift analysiswill present impacts of the AEOLIX ecosystem as identified from the initial implementation of the Living Labs (M18, M24, M30).
Liaison plan with projects and initiativesA liaison plan will be developed to provide information on cooperation with SELIS, NEXTRUST, SYNCRONET and initiatives (policy and standardisation).
Innovation Platform establishmentSummary of the work on defining Terms of Reference, initial launching partners and first concepts for long-term sustainability. The report will also define rules for accepting new members and managing potential IPRs.
AEOLIX living labs implementation planThe AEOLIX living labs implementation plan will provide the implementation and specificities of each of the living labs. A draft at M4 and a final at M6
AEOLIX Services and Interoperability AdaptersThis report encompassing the implementations of the Interoperability service adapters and Security Service with the detailed documentation and technical specification of each AEOLIX service. (M24)
KPIs and evaluation criteriaEvaluation criteria and performance targets will as a first step be set in collaboration with the LL leaders and will take into account use cases, LL setup, historical data and projection and models of the expected impact of each of the applications at each site. This Task will also specify each variable to be collected in order to standardize the format of each variable for the common evaluation. The global approach will also be addressed as an input to impact analysis for a future AEOLIX solution covering all possible use cases. (M17)
report about TESTFESTS eventsreport about TESTFESTS events. A first report in M14 and second report on M26
Business and user engagement strategyPresenting the key business and user targets and an elaborated strategy on how best to approach them, main interests they may have in AEOLIX and division of work between project partners in order to engage them in the AEOLIX work.
AEOLIX Final reportThe final report has the ambition to summarise the work performed by the Consortium members and the interaction with any external stakeholders.
AEOLIX Connectivity Engine reference implementationReport describing the AEOLIX Connectivity engine with links to external systems, as well as security and scalability issues and software realizing the AEOLIX Ecosystem. (M24)
AEOLIX ToolkitSolution Development tools adapted and connected to the ecosystem through the developers services , to support development of applications and dashboards for the living labs including: eCMR, forward multimodal planning, ETA service, horizontal/vertical collaboration, deviation management/CAPA and telematics services. (M30)
Exploitation and sustainability plansReport summarising joint and separate exploitation and sustainability plans, focusing on a.o. Innovation Platform, AEOLIX technical platform after-project life, as well as exploitation plans from each of the project partners.
Connectivity Gap AnalysisThe Connectivity Gap Analysis defines the data flow and gaps as experienced by the logistics partners that are hampering effective and efficient supply chain operations and transactions.
AEOLIX global needs and requirementsD2. 3 AEOLIX global needs and requirements (M17) D2. 3.1 Strategic Market Analysis. This deliverable will be an inventory and analysis of current supply and demand of logistics services and supply of ICT services relevant to the scope of this project. (M17) D2. 3.2 Trends and future development of logistics collaboration. This deliverable will be the result of a Delphi-study aimed at identifying trends and need for future development regarding ICT and supply chains. (M17)
report about TESTFESTS events V2.0 [27]. Report about TESTFESTS events V2.0.
A project website will be developed early in the project with necessary links with social media
The AEOLIX Reference BookThe results will be continually communicated via a dedicated space on the AEOLIX website, the AEOLIX Reference Book as well as via direct meetings with representatives of other WPs. (M12-36)
Publications
Author(s):
Jose Maria Salanova Grau
Published in:
ITS European Congress proceedings, 2017
Publisher:
ERTICO-ITS Europe
Author(s):
Jose Maria Salanova Grau
Published in:
ITS European Congress proceedings, 2017
Publisher:
ERTICO-ITS Europe
Author(s):
Iraklis Stamos
Published in:
ITS European Congress proceedings, 2017
Publisher:
ERTICO-ITS Europe
Author(s):
Maria Pia Fanti
Published in:
14th IEEE International Conference on Automation Science and Engineering, 2018
Publisher:
14th IEEE International Conference on Automation Science and Engineering
Author(s):
Per Wide
Published in:
Nofoma 2018, 2018
Publisher:
Nofoma 2018
Author(s):
Per Wide
Published in:
Logistics Research Network (Lrn), 2018
Publisher:
Logistics Research Network (Lrn)
Author(s):
Maria Pia Fanti
Published in:
2018 IEEE International Conference on Systems, Man, and Cybernetics (SMC), 2018
Publisher:
2018 IEEE International Conference on Systems, Man, and Cybernetics (SMC)
Author(s):
Maria Pia Fanti, Walter Ukovich
Published in:
European Transport Conference, 2018
Publisher:
European Transport Conference
Author(s):
Asif Akram, Chuanwen-Dong, Per-olof Arnäs
Published in:
6th EurOMA Sustainable Operations and Supply Chain Management Forum, 2019
Publisher:
6th EurOMA Sustainable Operations and Supply Chain Management Forum
Author(s):
Asif Akram, Chuanwen-Dong, Per-olof Arnäs, Stefan Gunnarsson, Dan Andersson
Published in:
Nofoma 2019, 2019
Publisher:
Nofoma 2019
Author(s):
Eusebiu Catana
Published in:
ITS European Congress Eindhoven 2019, 2019
Publisher:
ERTICO-ITS Europe
Author(s):
Eusebiu Catana
Published in:
ITS World Congress Copenhagen 2018, 2018
Publisher:
ERTICO-ITS Europe
Author(s):
Louahdi Khoudour
Published in:
Journées transport et déplacements du RST, 2017
Publisher:
Journées transport et déplacements du RST
Author(s):
Björn Regenhardt
Published in:
Verolog 2017, 2017
Publisher:
Verolog 2017
Author(s):
Alan Lewis
Published in:
ITS4Climate 2019, 2019
Publisher:
ITS4Climate 2019
Author(s):
Alexander Kleff
Published in:
International Conference on Computational Logistics 2017, 2017
Publisher:
International Conference on Computational Logistics 2017
Author(s):
Beatrice Di Pierro, Giorgio Iacobellis, Biagio Turchiano, Walter Ukovich
Published in:
2017 IEEE International Conference on Service Operations and Logistics, and Informatics (SOLI), 2017, Page(s) 236-241, ISBN 978-1-5090-5847-1
Publisher:
IEEE
DOI:
10.1109/SOLI.2017.8121000
Author(s):
Maria Pia Fanti, Giorgio Iacobellis, Agostino Marcello Mangini, Ilario Precchiazzi, Walter Ukovich
Published in:
2017 IEEE International Conference on Service Operations and Logistics, and Informatics (SOLI), 2017, Page(s) 224-229, ISBN 978-1-5090-5847-1
Publisher:
IEEE
DOI:
10.1109/SOLI.2017.8120998
Author(s):
M. Clemente, M. P. Fanti, M. Nolich, G. Stecco, W. Ukovich
Published in:
2017 13th IEEE Conference on Automation Science and Engineering (CASE), 2017, Page(s) 231-236, ISBN 978-1-5090-6781-7
Publisher:
IEEE
DOI:
10.1109/COASE.2017.8256108
Author(s):
Per Wide
Published in:
Nofoma 2019, 2019
Publisher:
Nofoma 2019
Author(s):
Asif Akram, Chuanwen-Dong, Per-olof Arnäs, Iraklis Stamos
Published in:
Journal of Business Logistics OR Transportation Research Part C: Emerging Technologies, 2019, ISSN 0957-4093
Publisher:
Emerald Group Publishing Ltd.
Author(s):
Asif Akram, Chuanwen-Dong, Per-olof Arnäs
Published in:
Journal of Industrial Engineering and Management OR Transportation Research, 2019, ISSN 0957-4093
Publisher:
Emerald Group Publishing Ltd.
Author(s):
Asif Akram, Stig Franzen, Georgia Aifantopoulou
Published in:
Journal - European Journal of Operation Research OR Transportation Research, 2019, ISSN 0957-4093
Publisher:
Emerald Group Publishing Ltd.
Author(s):
Asif Akram
Published in:
Journal - Information Technology for Development Special issue on blockchain applications, 2019, ISSN 0957-4093
Publisher:
Emerald Group Publishing Ltd.
Author(s):
Akram, Asif; Bross, Philipp
Published in:
Proceedings of the Twelfth Mediterranean Conference on Information Systems, Issue 1, 2018, ISSN 0957-4093
Publisher:
Emerald Group Publishing Ltd.
Author(s):
Akram, Asif; Arnäs, Per-Olof; Dong, Chuanwen
Published in:
Journal - European Journal of Operation Research OR Transportation Research, Issue 1, 2019, ISSN 0957-4093
Publisher:
Emerald Group Publishing Ltd.
Author(s):
Eusebiu Catana, Iraklis Stamos, German Herrero, Phanthian Zuesongdham and Florian Krietsch
Published in:
DTLF, 2016
Publisher:
DG-MOVE
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available