Deliverables
Detail the strategy and concrete actions for the protection, exploitation and dissemination of the project results The PEDR will be updated every five month (5/10/15/20)
Final technology and market watch report
IPR guidelines. IPR share beyond CA Final IPR report. the IPR report will be updated at the end of the Project (Month 20)
Description of the business's future, including IPR and evolution of the market. the final business plan will be updated at the end of the Project (Month 20)
Fully operational demonstration plant with all components installed and already commissioned. Detailed design of the demonstration plant (2D Drawings). Documentation including operational procedures, maintenance procedure, and start-up process
Prototype of the power electronic system. Electronic system assembly. Quality check
Program interface. Communication with OPC middleware PLC status. The deliverable will include the description of the modules developed for the backend and the specification for the APIs each module provides
Compilation of software licenses needed for the development, correct commissioning and normal running of the power stage system. List of specifications, signals, structures and program blocks. Final design and programme
System implemented in one of the Girona city council facilities SARGAS facilities (Both in Spain)
Power equipment defined. Evidences of the power stages assembly and quality check
Web monitoring and mobile application allowing monitoring view
Promotional material; Logo, Power point official presentation, Brochure, Poster, Press releases. Publications etc Target groups for customized actions
public area and intranet
Real-scale prototype with all components installed and already commissioned Manufacturing of the optimized turbine