Resultado final
Detail the strategy and concrete actions for the protection, exploitation and dissemination of the project results The PEDR will be updated every five month (5/10/15/20)
Technology and market watch interim reportFinal technology and market watch report
IPR protection interim reportIPR guidelines. IPR share beyond CA Final IPR report. the IPR report will be updated at the end of the Project (Month 20)
Final Business PlanDescription of the business's future, including IPR and evolution of the market. the final business plan will be updated at the end of the Project (Month 20)
Fully operational demonstration plant with all components installed and already commissioned. Detailed design of the demonstration plant (2D Drawings). Documentation including operational procedures, maintenance procedure, and start-up process
Power electronic systemPrototype of the power electronic system. Electronic system assembly. Quality check
Platform backend. back end applicationProgram interface. Communication with OPC middleware PLC status. The deliverable will include the description of the modules developed for the backend and the specification for the APIs each module provides
Software licences. Control systemCompilation of software licenses needed for the development, correct commissioning and normal running of the power stage system. List of specifications, signals, structures and program blocks. Final design and programme
Implemented demonstration plant commissionedSystem implemented in one of the Girona city council facilities SARGAS facilities (Both in Spain)
Assembled power systemPower equipment defined. Evidences of the power stages assembly and quality check
Web monitoring and mobile application allowing monitoring view
Dissemination materialPromotional material; Logo, Power point official presentation, Brochure, Poster, Press releases. Publications etc Target groups for customized actions
Project Websitepublic area and intranet
Real-scale prototype with all components installed and already commissioned Manufacturing of the optimized turbine