Skip to main content
Aller à la page d’accueil de la Commission européenne (s’ouvre dans une nouvelle fenêtre)
français fr
CORDIS - Résultats de la recherche de l’UE
CORDIS

IMplementation of Powertrain Control for Economic and Clean Real driving emIssion and fuel ConsUMption

Objectif

Fuel economy is a key aspect to reduce operating costs and improve efficiency of freight traffic, thus increasing truck competitiveness.

The main objective of the IMPERIUM project (IMplementation of Powertrain Control for Economic and Clean Real driving EmIssion and ConsUMption) is to achieve fuel consumption reduction by 20% (diesel and urea) whilst keeping the vehicle within the legal limits for pollutant emissions. The approach relies on three stages targeting the improvement of the control strategy:

* Direct optimisation of the control of the main components (engine, exhaust after-treatment, transmission, waste heat recovery, e-drive) to maximize their performances.

* Global powertrain energy manager to coordinate the different energy sources and optimize their use depending on the current driving situation.

* Providing a more comprehensive understanding of the mission (eHorizon, mission-based learning) such that the different energy sources can be planned and optimized on a long term.

The IMPERIUM consortium consist of major European actors and is able to provide a 100% European value chain for the development of future powertrain control strategies for trucks.

Champ scientifique (EuroSciVoc)

Programme(s)

Thème(s)

Régime de financement

IA - Innovation action

Voir tous les projets financés dans le cadre de ce programme de financement

Appel à propositions

(s’ouvre dans une nouvelle fenêtre) H2020-GV-2014-2015

Voir tous les projets financés au titre de cet appel

Coordinateur

AVL LIST GMBH
Contribution nette de l'UE
€ 1 150 001,41
Adresse
HANS-LIST-PLATZ 1
8020 Graz
Autriche
Région
Südösterreich Steiermark Graz
Type d’activité
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Liens
Coût total
€ 2 003 317,91

Participants (24)