Deliverables Documents, reports (16) Final industrial design of the battery a final industrial design for a marketable battery will be realized. Report on battery lab tests and validation a report including the battery validation will be realized, including a final chapter on critical issues eventually evidenced Residential/SME microgrid management platform Residential/SME microgrid management platform Final Progress reports reports the overall work and the results provided First Multi-objective microgrid optimisation tool different microgrid components will be optimized with regard to several constraints Specification of the BSC controller Detailed specification and design of the BSC controller, and the respective implementation within the reference embedded platform. Industrial requirements the AQDS battery production. Technical report which de- scribes main problems and functionalities to be supported by GREENERNET developments. Report on battery standalone tests and validation a report on the battery in-field standalone validation will be realized, including a final chapter on critical issues eventually evidenced. Technical plans of the field test system Report on the whole test environment plans including layout, schematics, wiring, test operation steps and expected verification procedure. Documentation of the test operation Report on the result of the test operation Product Royalties Mgmt CE certification Optimized electrolytes electrolytes will be optimized on performance and cost targets. Requirement document for the BSC and a specification of the control algorithms. This document will include the main details on the BSC development. First Year Progress reports reports the first year of GREENERNET activity Design reports Technical report which includes the obtained reference model satisfying industrial requirements detected in T1.1 and the high level architecture design based on this reference model that will be used for implementing GREENERNET solution Uses Cases Test Report This deliverable report the actual data from test cycles. Websites, patent fillings, videos etc. (1) Dissemination and Communication plan & report reports the T6.1 activities Other (2) Final Residential/SME microgrid management platform Final Residential/SME microgrid management platform Final Multi-objective microgrid optimisation tool Final Multi-objective microgrid optimisation tool Searching for OpenAIRE data... There was an error trying to search data from OpenAIRE No results available