Final industrial design of the battery
(opens in new window)
a final industrial design for a marketable battery will
be realized.
Report on battery lab tests and validation
(opens in new window)
a report including the battery validation will be
realized, including a final chapter on critical issues eventually evidenced
Residential/SME microgrid management platform
(opens in new window)
Final Progress reports
(opens in new window)
reports the overall work and the results provided
First Multi-objective microgrid optimisation tool
(opens in new window)
different microgrid components will be
optimized with regard to several constraints
Specification of the BSC controller
(opens in new window)
Detailed specification and design of the BSC controller, and
the respective implementation within the reference embedded platform.
Industrial requirements the AQDS battery production.
(opens in new window)
Technical report which de- scribes main
problems and functionalities to be supported by GREENERNET developments.
Report on battery standalone tests and validation
(opens in new window)
a report on the battery in-field standalone
validation will be realized, including a final chapter on critical issues eventually evidenced.
Technical plans of the field test system
(opens in new window)
Report on the whole test environment plans including
layout, schematics, wiring, test operation steps and expected verification procedure.
Documentation of the test operation
(opens in new window)
Report on the result of the test operation
Product Royalties Mgmt
(opens in new window)
CE certification
Optimized electrolytes
(opens in new window)
electrolytes will be optimized on performance and cost targets.
Requirement document for the BSC and a specification of the control algorithms.
(opens in new window)
This document will include the main details on the BSC development.
First Year Progress reports
(opens in new window)
reports the first year of GREENERNET activity
Design reports
(opens in new window)
Technical report which includes the obtained reference model satisfying industrial
requirements detected in T1.1 and the high level architecture design based on this reference model that will be
used for implementing GREENERNET solution
Uses Cases Test Report
(opens in new window)
This deliverable report the actual data from test cycles.